Green Source Construction
- Based in
- El Dorado Hills
- On San Francisco permits
- Apr 2022 to Dec 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 10 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2022 | Completed final sign-off Aug 2023 | 1463 Clay St | (e) 4 story wood framed egress stair at rear yard is structurally unsafe and will be reconstructed 100% in-kind. replace rear siding w/ hardi planel lap siding. replace all (46) (e) windows in-kind. front windows facing street to be wood. u-factor = 0.30 or lessDetails
(e) 4 story wood framed egress stair at rear yard is structurally unsafe and will be reconstructed 100% in-kind. replace rear siding w/ hardi planel lap siding. replace all (46) (e) windows in-kind. front windows facing street to be wood. u-factor = 0.30 or less | $40,000 |