Back to bathroom remodel contractors
Green Hammer Design
- Based in
- Oakland
- On San Francisco permits
- May 2012 to Nov 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 1 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 expired or cancelled. Typically 8 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2012 | Expired or cancelled expired May 2015 | 2027 09th Av | expand into (e) lightwell to create new laundry room at living level. also remodel (e) bathroom with new fixtures & finishes. replace 3 windows & 1 door as shown on plans, not visible from the street. add electrical sub-panel at new laundry roomDetails
expand into (e) lightwell to create new laundry room at living level. also remodel (e) bathroom with new fixtures & finishes. replace 3 windows & 1 door as shown on plans, not visible from the street. add electrical sub-panel at new laundry room | $25,000 |