Green Hammer Design
- Based in
- Oakland
- On San Francisco permits
- May 2012 to Nov 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 1 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2025 | Completed final sign-off Dec 2025 | 126 Pierce St | replace (e) gas furnace and existing gas heater and replace with hybrid heating/cooling. add 1 dedicated 240v-30amp circuit, add 1 dedicated 240v- 15 amp circuit.Details
replace (e) gas furnace and existing gas heater and replace with hybrid heating/cooling. add 1 dedicated 240v-30amp circuit, add 1 dedicated 240v- 15 amp circuit. | $25,000 |
| Jul 19, 2012 | Expired or cancelled expired May 2015 | 2027 09th Av | revisoin to appl #2012.0515.0475 - minor alterations to framing: addition of non-structural wall behind cooktop. addition of 4 x8 heater at interior door at dining room/living room. alteration of kitchen ceiling joists to accomodate future work.Details
revisoin to appl #2012.0515.0475 - minor alterations to framing: addition of non-structural wall behind cooktop. addition of 4 x8 heater at interior door at dining room/living room. alteration of kitchen ceiling joists to accomodate future work. | $150 |
| May 15, 2012 | Expired or cancelled expired May 2015 | 2027 09th Av | expand into (e) lightwell to create new laundry room at living level. also remodel (e) bathroom with new fixtures & finishes. replace 3 windows & 1 door as shown on plans, not visible from the street. add electrical sub-panel at new laundry roomDetails
expand into (e) lightwell to create new laundry room at living level. also remodel (e) bathroom with new fixtures & finishes. replace 3 windows & 1 door as shown on plans, not visible from the street. add electrical sub-panel at new laundry room | $25,000 |
| May 8, 2012 | Expired or cancelled expired May 2015 | 2027 09th Av | complete kitchen remodel including new appliances, cabinets, countertops, electrical upgrade at kitchen, dining room & living room. (4) window replacement in same opening, smaller window & install insulationDetails
complete kitchen remodel including new appliances, cabinets, countertops, electrical upgrade at kitchen, dining room & living room. (4) window replacement in same opening, smaller window & install insulation | $45,000 |