Green Carpet Landscaping & Maintenance
- Based in
- South San Francisco
- On San Francisco permits
- May 2013 to May 2013
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 27 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2013 | Completed final sign-off Jun 2013 | 1160 Prague St | replacing the extg stairs of the wood deck in the back yard. 2 stories in same locations at the same configuration. pressure treated wood for runners and redwood steps.Details
replacing the extg stairs of the wood deck in the back yard. 2 stories in same locations at the same configuration. pressure treated wood for runners and redwood steps. | $3,500 |