Back to bathroom remodel contractors
Green California Builders Inc
- Based in
- San Jose
- On San Francisco permits
- Oct 2018 to Nov 2025
- Last 24 months
- 4 permits filed
23 permits since 2000: 18 completed, 3 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2025 | In progress issued Apr 2025 | 132 Beulah St | add sink in (e) split bath on top floor. add 2nd toilet and vanity in (e) split bath on top floor. non-structural remodel of kitchen and pantry.Details
add sink in (e) split bath on top floor. add 2nd toilet and vanity in (e) split bath on top floor. non-structural remodel of kitchen and pantry. | $6,000 |
| Sep 1, 2022 | Completed final sign-off Jul 2023 | 2550 47th Av | structural work. kitchen & bathroom remodeling, (e) subpanel upgrade to 100a. build new deck, window replacement (2), new doors (2).Details
structural work. kitchen & bathroom remodeling, (e) subpanel upgrade to 100a. build new deck, window replacement (2), new doors (2). | $130,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2022 | 167 Lower Tr | bathroom remodeling (like to like) replace sink, toilet, tub shower combo. 5'x7'Details
bathroom remodeling (like to like) replace sink, toilet, tub shower combo. 5'x7' | $25,000 |
| May 18, 2021 | Completed final sign-off Aug 2021 | 372 Carl St | kitchen remoel like to like. plumbing same location. add recess lights gfci. remodel master bath like to like. remodel shower, replace fixtures. new light, gfci. guest bath remodel. no structural workDetails
kitchen remoel like to like. plumbing same location. add recess lights gfci. remodel master bath like to like. remodel shower, replace fixtures. new light, gfci. guest bath remodel. no structural work | $98,000 |
| Feb 25, 2021 | Never finaled issued Feb 2021, no final | 319 Virginia Av | bath remodel. sam location plumbing, convert tub to shower, 3 new led rece3ssed lights, add 1 new gfci outlet, install 1 new exhaust fan, 1 new switchDetails
bath remodel. sam location plumbing, convert tub to shower, 3 new led rece3ssed lights, add 1 new gfci outlet, install 1 new exhaust fan, 1 new switch | $26,000 |
| Oct 13, 2020 | Completed final sign-off Feb 2021 | 650 Chestnut St | kitchen remodeling (like to like) master bath remodeling-converted tub to shower, guest both remodeling (like for like) 14 recess lights through the house no wall being removed or altered.Details
kitchen remodeling (like to like) master bath remodeling-converted tub to shower, guest both remodeling (like for like) 14 recess lights through the house no wall being removed or altered. | $93,000 |
| Sep 10, 2020 | Completed final sign-off Nov 2020 | 1961 Beach St | bathroom and powder room remodeling like to likeDetails
bathroom and powder room remodeling like to like | $38,000 |
| Sep 10, 2020 | Completed final sign-off Oct 2020 | 101 Stoneridge Ln | guest bathroom remodeling like to like. no structural, no plmg relocation. replace vanity double sink. replace toilet, replace tub. add gfci, replace exhaust fan.Details
guest bathroom remodeling like to like. no structural, no plmg relocation. replace vanity double sink. replace toilet, replace tub. add gfci, replace exhaust fan. | $24,000 |
| Aug 12, 2020 | Completed final sign-off Oct 2020 | 565 Pennsylvania Av | guest bathroom remodel in kind. plumbing same location(no structural work). master bathroom remodel- convert tub to curbless shower, replae single sink vanity with double sink vanity (no structral work)Details
guest bathroom remodel in kind. plumbing same location(no structural work). master bathroom remodel- convert tub to curbless shower, replae single sink vanity with double sink vanity (no structral work) | $48,000 |
| Jul 13, 2020 | Completed final sign-off Nov 2020 | 3191 Washington St | unit# 6. kitchen remodeling (like to like). 2 bathroom remodel (like to like). not removing any walls.Details
unit# 6. kitchen remodeling (like to like). 2 bathroom remodel (like to like). not removing any walls. | $92,000 |
| Oct 2, 2018 | Completed final sign-off Oct 2020 | 329 Chicago Wy | addition of 316 sq ft to back of existing house, bedroom and bathDetails
addition of 316 sq ft to back of existing house, bedroom and bath | $80,000 |