Block 1250, lot 012
132 Beulah St
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 2
- Rooms
- 5 bedrooms, 3 bathrooms
- Building
- 3,550 sq ft
- Lot
- 3,438 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 132 Beulah St | renew | ||
| Aug 13, 2026 | In progress issued Aug 2026 | 132 Beulah St | Greenline Home Remodeling Inc | recommencent and completion of work previously approved under ppa# 202112023509, 202502281376, and 202504174690.Details
recommencent and completion of work previously approved under ppa# 202112023509, 202502281376, and 202504174690. | $45,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 132 Beulah St | Green California Builders Inc | add sink in (e) split bath on top floor. add 2nd toilet and vanity in (e) split bath on top floor. non-structural remodel of kitchen and pantry.Details
add sink in (e) split bath on top floor. add 2nd toilet and vanity in (e) split bath on top floor. non-structural remodel of kitchen and pantry. | $6,000 |
| Feb 28, 2025 | In progress issued Mar 2025 | 132 Beulah St | Green California Builders Inc | revision 202412066357 & 202112023509 - remove brick chimney at upper unit only; locatd between kitchenn and pantryDetails
revision 202412066357 & 202112023509 - remove brick chimney at upper unit only; locatd between kitchenn and pantry | $6,000 |
| Dec 6, 2024 | In progress issued Dec 2024 | 132 Beulah St | Green California Builders Inc | recommencement and complettion of work approved under pa # 2021-1202-3509Details
recommencement and complettion of work approved under pa # 2021-1202-3509 | $6,000 |
| Dec 2, 2021 | Never finaled issued Dec 2021, no final | 132 Beulah St | Christopher Wells Construction Inc. | unit #132:repair water damaged lath & plaster,wood trim,tile & cabinets.approximate lath & plaster damage 2000sf(ceiling and walls) replace w/ lath and plaster.Details
unit #132:repair water damaged lath & plaster,wood trim,tile & cabinets.approximate lath & plaster damage 2000sf(ceiling and walls) replace w/ lath and plaster. | $15,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 130 Beulah St | street spaceDetails
street space | ||
| Jul 17, 2018 | Completed final sign-off Jan 2019 | 130 Beulah St | Christopher Wells Construction Inc. | repair water damaged lath and plaster and replace bathroom tile only in #130. approximate lath and plaster damage, 200 sq. ft. in bathroom and adjacent hallway. tile is at tub area, approx 35 sq ftDetails
repair water damaged lath and plaster and replace bathroom tile only in #130. approximate lath and plaster damage, 200 sq. ft. in bathroom and adjacent hallway. tile is at tub area, approx 35 sq ft | $15,000 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 130 Beulah St | street spaceDetails
street space | ||
| May 16, 2018 | Never finaled issued May 2018, no final | 130 Beulah St | street spaceDetails
street space | ||
| Feb 7, 2018 | Completed final sign-off Apr 2018 | 132 Beulah St | Excelsior Roofing Company | reroofing.Details
reroofing. | $18,850 |
| Feb 28, 2012 | Completed final sign-off Mar 2012 | 130 Beulah St | Dobrovat & Co | remove siding (approx. 6'x15') on front west corner of building including window to investigate dry rot. replace damaged window & framing in kind. patch interior as necessary to match (e).Details
remove siding (approx. 6'x15') on front west corner of building including window to investigate dry rot. replace damaged window & framing in kind. patch interior as necessary to match (e). | $5,000 |
| Jan 31, 2012 | Completed final sign-off Mar 2012 | 130 Beulah St | Dobrovat & Co | deck and stair replacement at rear due to dry rot exceeding 50%. stair to grade. replace in kind. comply with his nov 201175614. revision to 201111048270Details
deck and stair replacement at rear due to dry rot exceeding 50%. stair to grade. replace in kind. comply with his nov 201175614. revision to 201111048270 | $25,000 |
| Nov 4, 2011 | Completed final sign-off Mar 2012 | 130 Beulah St | Dobrovat & Co | repair dryrot @ deck, 50% or less.Details
repair dryrot @ deck, 50% or less. | $25,000 |
| Apr 9, 2007 | Expired or cancelled cancelled Oct 2007 | 130 Beulah St | heat pump on roof, not visible from street, approx 65 lbs to augment existing gas wall units. approx 38" hight, 48" wideDetails
heat pump on roof, not visible from street, approx 65 lbs to augment existing gas wall units. approx 38" hight, 48" wide | $13,500 | |
| Jan 30, 2006 | Expired or cancelled expired Aug 2007 | 132 Beulah St | Home Works Inc/Kitchen Work Inc | replace 16 windows and 3 patio doors, size for size, wood to wood composite. visible from street.Details
replace 16 windows and 3 patio doors, size for size, wood to wood composite. visible from street. | $31,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dobrovat & Co (3), Green California Builders Inc (3), Christopher Wells Construction Inc. (2), Excelsior Roofing Company, Greenline Home Remodeling Inc, Home Works Inc/Kitchen Work Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.