Back to kitchen remodel contractors
Great Wall Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2001 to Sep 2020
- Last 24 months
- 0 permits filed
19 permits since 2000: 7 completed, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 1 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2017 | Completed final sign-off Oct 2017 | 321 Bridgeview Dr | construct two new bedrooms, one full bathroon, kitchen exhaust fan, bathroom fans, laundry room @ ground floor. relocate kitchen , remodel (e) bathroom, construct one (n) bathroom & convert (e) kitchen space to bedroom at 2nd floor. construct new deck w/staircase at rear of bldg.Details
construct two new bedrooms, one full bathroon, kitchen exhaust fan, bathroom fans, laundry room @ ground floor. relocate kitchen , remodel (e) bathroom, construct one (n) bathroom & convert (e) kitchen space to bedroom at 2nd floor. construct new deck w/staircase at rear of bldg. | $62,000 |
| Feb 13, 2017 | Never finaled issued Feb 2017, no final | 1963 34th Av | replace kitchen cabinets. re-sheet rock bath wall & ceiling.Details
replace kitchen cabinets. re-sheet rock bath wall & ceiling. | $20,000 |
| Feb 13, 2017 | Never finaled issued Feb 2017, no final | 1963 34th Av | install tile in the bathroom floor. replace 15feet kitchen cabinets.Details
install tile in the bathroom floor. replace 15feet kitchen cabinets. | $8,200 |
| Mar 12, 2007 | Never finaled issued Mar 2007, no final | 20 Mallorca Wy | remove old tile in bath room and install new tiles, replace cabinets and counter top in kitchen, no changeing lightsDetails
remove old tile in bath room and install new tiles, replace cabinets and counter top in kitchen, no changeing lights | $2,500 |
| Dec 4, 2003 | Never finaled issued Dec 2003, no final | 2374 27th Av | fire damage repair roof kitchen ceiling.Details
fire damage repair roof kitchen ceiling. | $16,500 |
| Jan 27, 2001 | Expired or cancelled expired Jul 2001 | 250 27th Av | replace kitchen cabs & remodel bathrm relocate el outlet (unit 252 27th ave)Details
replace kitchen cabs & remodel bathrm relocate el outlet (unit 252 27th ave) | $10,000 |