Grand American Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2019
- Last 24 months
- 0 permits filed
59 permits since 2000: 53 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 5 days from filing to permit and 340 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2019 | Completed final sign-off Nov 2019 | 470 Monticello St | replace extg south retaining wall at garage. new concrete retaining wall, patio and steps at rear yard. new door openings from family room and garage to new patio. replace extg interior stair. remodel extg master bath. remove exterior concrete landing & steps.Details
replace extg south retaining wall at garage. new concrete retaining wall, patio and steps at rear yard. new door openings from family room and garage to new patio. replace extg interior stair. remodel extg master bath. remove exterior concrete landing & steps. | $10,000 |
| Feb 5, 2014 | Completed final sign-off Jan 2015 | 1454 45th Av | 1)relocate extg interior stair. 2) relocate laundry facilities. 3)convert ground floor area to a bedroom, a bathroom and a thru-pass to rear yard approx 378 sq ft. 4)add new closets. 5) all work to be completed as necessary for plmg, electrical, mech, safety and insulation.Details
1)relocate extg interior stair. 2) relocate laundry facilities. 3)convert ground floor area to a bedroom, a bathroom and a thru-pass to rear yard approx 378 sq ft. 4)add new closets. 5) all work to be completed as necessary for plmg, electrical, mech, safety and insulation. | $85,000 |
| May 23, 2013 | Completed final sign-off Jun 2015 | 111 Dellbrook Av | 2nd level: open (e) stairway to living area. add skylight. convert (e) bedroom to den. add roof deck over ground level addition with stair to rear yard. 1st levels horizontal extension. rear yard extension include 2 bedrooms, 1 new bath, remodel (e) bedroom & bathroom. laundry, new fau & h2o heater.Details
2nd level: open (e) stairway to living area. add skylight. convert (e) bedroom to den. add roof deck over ground level addition with stair to rear yard. 1st levels horizontal extension. rear yard extension include 2 bedrooms, 1 new bath, remodel (e) bedroom & bathroom. laundry, new fau & h2o heater. | $110,000 |
| Apr 30, 2010 | Completed final sign-off Jun 2011 | 3224 Market St | interior reconfiguration - kitchen remodel, two bathroom remodel & repair of interior finishes as required. relocate stair between 1st floor & attic. no exterior work.Details
interior reconfiguration - kitchen remodel, two bathroom remodel & repair of interior finishes as required. relocate stair between 1st floor & attic. no exterior work. | $87,000 |
| Mar 2, 2009 | Completed final sign-off Jan 2010 | 149 Collins St | new work is limited to site plan only. new concrete patio & stairs @ rear of the building new retaining wall & stairs @ rear yard. existing storage shed remains the same 8'0" max in height. revision to application 200801102221.Details
new work is limited to site plan only. new concrete patio & stairs @ rear of the building new retaining wall & stairs @ rear yard. existing storage shed remains the same 8'0" max in height. revision to application 200801102221. | $2,000 |