Back to bathroom remodel contractors
Good Neighbor Construction
- Based in
- Millbrae
- On San Francisco permits
- May 2008 to Feb 2025
- Last 24 months
- 2 permits filed
96 permits since 2000: 87 completed, 1 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
49 bathroom remodel permits: 46 completed, 1 in progress, 2 expired or cancelled. Typically 3 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2025 | Completed final sign-off Jul 2025 | 1251 Vicente St | unit b: kitchen and 1 bath remodel. no layout changeDetails
unit b: kitchen and 1 bath remodel. no layout change | $40,000 |
| Jan 18, 2024 | Completed final sign-off Dec 2024 | 2238 36th Av | add rooms downstairs. 1 bath, 1 powder, 1 bedroom. 1 living /study, 1 wetbar, new footing opt b and concrete slab. modify rear elevation for news doors.Details
add rooms downstairs. 1 bath, 1 powder, 1 bedroom. 1 living /study, 1 wetbar, new footing opt b and concrete slab. modify rear elevation for news doors. | $16,000 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 329 Dellbrook Av | master bedroom with bath. revision to pa#202010025707. reduce one bathroom.Details
master bedroom with bath. revision to pa#202010025707. reduce one bathroom. | |
| Jun 14, 2022 | Completed final sign-off Dec 2022 | 1958 30th Av | (e) 2nd fl remodel: bath & kitchen, roofing and framing above the bathtub, enlarge wall opening btw living and kitchen, remove fireplace.Details
(e) 2nd fl remodel: bath & kitchen, roofing and framing above the bathtub, enlarge wall opening btw living and kitchen, remove fireplace. | $45,000 |
| Feb 8, 2022 | Completed final sign-off Apr 2022 | 1425 26th Av | basement: 1 bathroom remodel. replace shower pan. tile and faucet. no change layout.Details
basement: 1 bathroom remodel. replace shower pan. tile and faucet. no change layout. | $8,000 |
| Aug 25, 2021 | Completed final sign-off Jul 2022 | 1724 Greenwich St | in kind 1 kitchen & 2 bath remodel, replace 4 windows street facing, no structural change. replacement fenestration max. u-factor = 0.40. lighting h.e. & per cec 150.0(k). aluminium clad, wood, double hungDetails
in kind 1 kitchen & 2 bath remodel, replace 4 windows street facing, no structural change. replacement fenestration max. u-factor = 0.40. lighting h.e. & per cec 150.0(k). aluminium clad, wood, double hung | $30,000 |
| Mar 1, 2021 | Completed final sign-off Dec 2021 | 759 17th Av | in kind kitchen and 1 bath remoel. no structural change. apt 2Details
in kind kitchen and 1 bath remoel. no structural change. apt 2 | $30,000 |
| Feb 4, 2021 | In progress issued May 2024 | 1478 33rd Av | in-law legalization ordinance# 43-14 of existing 528 sf accessory dwelling unit (udu), including one bedroom, one bath, and one kitchen.Details
in-law legalization ordinance# 43-14 of existing 528 sf accessory dwelling unit (udu), including one bedroom, one bath, and one kitchen. | $19,000 |
| Dec 15, 2020 | Completed final sign-off Jul 2021 | 130 Graystone Tr | revision to pa# 201702038561. at new unit #2a, relocate kitchen & dining. reconfigure bathroom layout. at new unit #3a & #5a, add new window, & new electrical wall heaters.Details
revision to pa# 201702038561. at new unit #2a, relocate kitchen & dining. reconfigure bathroom layout. at new unit #3a & #5a, add new window, & new electrical wall heaters. | $5,000 |
| Oct 5, 2020 | Completed final sign-off Apr 2021 | 2040 Franklin St | apt 1204: in kind one kitchen and one bathroom remodel. replace cabinets and tile, no change at sink, toilet and shower location.Details
apt 1204: in kind one kitchen and one bathroom remodel. replace cabinets and tile, no change at sink, toilet and shower location. | $30,000 |
| Oct 2, 2020 | Completed final sign-off Aug 2023 | 329 Dellbrook Av | remodel of 1/f to retain a single-car garage & reconfigure the remaining space to open office, family room, closets, bathroom & a master bedroom suite.Details
remodel of 1/f to retain a single-car garage & reconfigure the remaining space to open office, family room, closets, bathroom & a master bedroom suite. | $125,000 |
| May 29, 2019 | Completed final sign-off Dec 2021 | 3 Caine Av | horizontal addition. 1 new bed & 1 new bath.Details
horizontal addition. 1 new bed & 1 new bath. | $75,000 |
| Apr 17, 2019 | Completed final sign-off Jan 2020 | 221 03rd Av | 1st flr interior renovation: bathroom renovation, new bedroom, new laundry room, rear yard pavementDetails
1st flr interior renovation: bathroom renovation, new bedroom, new laundry room, rear yard pavement | $15,000 |
| Jan 22, 2019 | Expired or cancelled expired Jan 2026 | 2459 40th Av | horizontal extension at rear of building, remodel existing building bedroom, bathroom and family room, new lighting, mew furance, new water heater, new plumbing, new deck with staircase at rear, replace elec. main service panel with new and upgrage to 200 amps.Details
horizontal extension at rear of building, remodel existing building bedroom, bathroom and family room, new lighting, mew furance, new water heater, new plumbing, new deck with staircase at rear, replace elec. main service panel with new and upgrage to 200 amps. | $200,000 |
| Feb 6, 2018 | Completed final sign-off Apr 2019 | 1755 Filbert St | 150 sq ft. kitchen and (1) bath remodel electrical upgrades, no str. changesDetails
150 sq ft. kitchen and (1) bath remodel electrical upgrades, no str. changes | $35,000 |
| Dec 15, 2017 | Completed final sign-off Jul 2020 | 834 35th Av | add 1 bedroom, 1 full bath, 1 den, living rm at garage level. remodel kitchen, 2 baths, powder rm.Details
add 1 bedroom, 1 full bath, 1 den, living rm at garage level. remodel kitchen, 2 baths, powder rm. | $80,000 |
| Sep 14, 2017 | Completed final sign-off Apr 2018 | 328 Molimo Dr | kitchen & 1 bath remodel ,in same location no moving of walls, doors, or windowsDetails
kitchen & 1 bath remodel ,in same location no moving of walls, doors, or windows | $30,000 |
| Sep 5, 2017 | Completed final sign-off Apr 2018 | 667 Haight St | remodel extg kitchen and bathrooms. non structural construction. new cabinets, redo flooring, new tub shower and toilets. paint. n/a for maherDetails
remodel extg kitchen and bathrooms. non structural construction. new cabinets, redo flooring, new tub shower and toilets. paint. n/a for maher | $40,000 |
| Aug 3, 2017 | Completed final sign-off Apr 2018 | 1770 33rd Av | rremodel (1) bath at ground fl. relocate light well window & door.Details
rremodel (1) bath at ground fl. relocate light well window & door. | $30,000 |
| May 31, 2017 | Completed final sign-off Aug 2017 | 1743 Judah St | remodel 1 kitchen, 1 bath. no change on walls.Details
remodel 1 kitchen, 1 bath. no change on walls. | $20,000 |
| Feb 3, 2017 | Completed final sign-off Jul 2021 | 130 Graystone Tr | ****adu per ordinance# 162-16. refer to pa# 2016/04/04/3821. convert (e) storage to 3 dwelling with kitchens, baths, bedrooms & living rooms. 2-one bedroom units & 1- two bedroom unit.Details
****adu per ordinance# 162-16. refer to pa# 2016/04/04/3821. convert (e) storage to 3 dwelling with kitchens, baths, bedrooms & living rooms. 2-one bedroom units & 1- two bedroom unit. | $30,000 |
| Nov 4, 2016 | Completed final sign-off Jul 2017 | 2200 Sacramento St | kitchen & (2) bath remodel, update electrical & plumbing as needed; no changes to wall locations.Details
kitchen & (2) bath remodel, update electrical & plumbing as needed; no changes to wall locations. | $45,000 |
| Nov 4, 2016 | Completed final sign-off Mar 2018 | 2200 Sacramento St | kitchen & bath remodel, update electrical & plumbing as needed; no change to wall locations.Details
kitchen & bath remodel, update electrical & plumbing as needed; no change to wall locations. | $45,000 |
| May 11, 2016 | Completed final sign-off Dec 2017 | 174 26th Av | revision to pa #201509308448 - add elevator, change front windows & rear bathroom window. elevator will not penetrate the roof.Details
revision to pa #201509308448 - add elevator, change front windows & rear bathroom window. elevator will not penetrate the roof. | $20,000 |
| Mar 17, 2016 | Completed final sign-off Feb 2017 | 4735 California St | interior remodel, one bathroom, one bedroom, replace sliding door and change window to sliding door, relocate washer/dryer.Details
interior remodel, one bathroom, one bedroom, replace sliding door and change window to sliding door, relocate washer/dryer. | $30,000 |
| Jan 27, 2016 | Completed final sign-off Jun 2016 | 759 17th Av | apt #3: kitchen & 2 baths remodel, replace cabinet, tile, tub, toilet light & sinks.Details
apt #3: kitchen & 2 baths remodel, replace cabinet, tile, tub, toilet light & sinks. | $30,000 |
| Jan 7, 2016 | Completed final sign-off Sep 2017 | 846 32nd Av | revision to appl #201508204783: remove partial (e) non-load bearing, relocate laundry room, new den room @ laundry area & add one bathroom @ garage level. remodel (e) kitchen, remodel all (e) bathrooms & add (1) powder room, add two skylights. all (e) windows to remain. no change in occupancy.Details
revision to appl #201508204783: remove partial (e) non-load bearing, relocate laundry room, new den room @ laundry area & add one bathroom @ garage level. remodel (e) kitchen, remodel all (e) bathrooms & add (1) powder room, add two skylights. all (e) windows to remain. no change in occupancy. | $89,000 |
| Sep 30, 2015 | Completed final sign-off Dec 2017 | 174 26th Av | interior remodel of kitchen, baths, bedroom, roof decks, rear deck extension, change brick to wood slats in front, change rear doors & windows, redo stucco & roof.Details
interior remodel of kitchen, baths, bedroom, roof decks, rear deck extension, change brick to wood slats in front, change rear doors & windows, redo stucco & roof. | $275,000 |
| Aug 24, 2015 | Completed final sign-off Feb 2016 | 235 08th Av | remodel existing kitchen & bathroom, replace counter, cabinets, flooring. construct one new bathroom. all work at 2/f.Details
remodel existing kitchen & bathroom, replace counter, cabinets, flooring. construct one new bathroom. all work at 2/f. | $26,000 |
| May 28, 2015 | Completed final sign-off Oct 2015 | 227 Lake St | remodel kitchen & 1 bath. replace cabinet, tile, tub, light fixture, plumbing fixture. cosmetic. n/a ordinance #155-13.Details
remodel kitchen & 1 bath. replace cabinet, tile, tub, light fixture, plumbing fixture. cosmetic. n/a ordinance #155-13. | $20,000 |
| Jul 24, 2014 | Completed final sign-off Nov 2014 | 449 35th Av | (1) kitchen & (1) bath remodel. replace cabinet, tile, shower, faucet at same location. kitchen lighting & control per cec 150kDetails
(1) kitchen & (1) bath remodel. replace cabinet, tile, shower, faucet at same location. kitchen lighting & control per cec 150k | $20,000 |
| Jun 3, 2014 | Completed final sign-off Nov 2014 | 1354 42nd Av | two (2) kitchens & four (4) baths remodel, replace cabinetes, tile, appliances, shower, tub, fan at same location.Details
two (2) kitchens & four (4) baths remodel, replace cabinetes, tile, appliances, shower, tub, fan at same location. | $50,000 |
| May 30, 2014 | Completed final sign-off Apr 2015 | 116 Chaves Av | first floor adding 2 bedrooms, one family, two full bathroom and utility room. second floor remodel - kitchen and one bathroom remodel. recreate an interior stair between first and second floor. replace 19 existing windows not visible from street.Details
first floor adding 2 bedrooms, one family, two full bathroom and utility room. second floor remodel - kitchen and one bathroom remodel. recreate an interior stair between first and second floor. replace 19 existing windows not visible from street. | $80,000 |
| Dec 5, 2013 | Completed final sign-off Jun 2015 | 830 35th Av | interior remodel, 1/f: kitchen remodel, new powder room. 2/f: master bathroom & 2/f bathroom. elec. & plumbing & mech. work under seperate permit. no change in occupancy, single family, no change to parking, no change to ext. envelop.Details
interior remodel, 1/f: kitchen remodel, new powder room. 2/f: master bathroom & 2/f bathroom. elec. & plumbing & mech. work under seperate permit. no change in occupancy, single family, no change to parking, no change to ext. envelop. | $30,000 |
| Sep 25, 2013 | Expired or cancelled expired Dec 2016 | 262 28th Av | rear yard horizontal extension, remodel/add bathrooms/extend living area/remodel kitchen/add rumpus room add skylightDetails
rear yard horizontal extension, remodel/add bathrooms/extend living area/remodel kitchen/add rumpus room add skylight | $10,000 |
| Jun 28, 2013 | Completed final sign-off Feb 2014 | 2386 45th Av | kitchen & bathroom remodel, change 2 rear windows.Details
kitchen & bathroom remodel, change 2 rear windows. | $20,000 |
| Feb 25, 2013 | Completed final sign-off May 2013 | 451 35th Av | kitchen and bath remodel. replace cabinet, sink, coutner top, tile and light in kitchen, 50% high efficacy lighting. replace tub, cabinet, toilet, tile , fann and light in bath, 100% high efficacry lighting.Details
kitchen and bath remodel. replace cabinet, sink, coutner top, tile and light in kitchen, 50% high efficacy lighting. replace tub, cabinet, toilet, tile , fann and light in bath, 100% high efficacry lighting. | $18,000 |
| Oct 18, 2012 | Completed final sign-off Apr 2013 | 1911 48th Av | one kitchen and one bathroom remodel. replace furniture and water heater. replace window. total 6Details
one kitchen and one bathroom remodel. replace furniture and water heater. replace window. total 6 | $20,000 |
| Aug 13, 2012 | Completed final sign-off Dec 2012 | 759 17th Av | apt #4 - remodel kitchen: replace cabinet, tile, lights & remodel bathroom: replace tub, toilet, tile, light.Details
apt #4 - remodel kitchen: replace cabinet, tile, lights & remodel bathroom: replace tub, toilet, tile, light. | $15,000 |
| May 8, 2012 | Completed final sign-off Jul 2012 | 3862 19th Av | kitchen remodel: replace cabinet, tile, lighting, add gfci outlet. bathroom remodel: replace tub, toilet, tile, light. replace windows total 11 pcs (4 windows @ front in kind;7 vinyl windows @ rear. no structural work. new lighting to comply with cec (150)kDetails
kitchen remodel: replace cabinet, tile, lighting, add gfci outlet. bathroom remodel: replace tub, toilet, tile, light. replace windows total 11 pcs (4 windows @ front in kind;7 vinyl windows @ rear. no structural work. new lighting to comply with cec (150)k | $20,000 |
| Nov 28, 2011 | Completed final sign-off Mar 2012 | 85 Dartmouth St | legalize one bedroom, one bathroom, playroom & construct one new storage room. all work at ground floor.Details
legalize one bedroom, one bathroom, playroom & construct one new storage room. all work at ground floor. | $28,000 |
| Jul 5, 2011 | Completed final sign-off Sep 2011 | 209 Gold Mine Dr | 1.5 bath remodel. no structural work. replace tub, sinks, tiles, fans, lights, toilets. high efficacy lighting or occupancy sensor control.Details
1.5 bath remodel. no structural work. replace tub, sinks, tiles, fans, lights, toilets. high efficacy lighting or occupancy sensor control. | $10,000 |
| Apr 1, 2010 | Completed final sign-off Feb 2011 | 421 Moraga St | revision to pa# 2009.06.12.0320. flip the location of bath, study and closet on each unit. interior work only, no structural workDetails
revision to pa# 2009.06.12.0320. flip the location of bath, study and closet on each unit. interior work only, no structural work | |
| Dec 18, 2009 | Completed final sign-off Jan 2010 | 8 Reddy St | add 1 family room, 1 study room, add 1/2 bathroom and replace broken windows if broken. on ground floor. replace broken window if broken.Details
add 1 family room, 1 study room, add 1/2 bathroom and replace broken windows if broken. on ground floor. replace broken window if broken. | $8,000 |
| Oct 23, 2009 | Completed final sign-off Nov 2009 | 1218 Rhode Island St | replace bath tub, toilet, vanity, cabinet, fllor tiles. no electrical work is requiredDetails
replace bath tub, toilet, vanity, cabinet, fllor tiles. no electrical work is required | $3,000 |
| Jul 22, 2009 | Completed final sign-off Oct 2009 | 1720 Grant Av | interior remodel to include interior non-structural wall reemoval, bath room remodel. interior painting, minor interior drywall patching. note: no sq. ft. change nor exterior building envelope.Details
interior remodel to include interior non-structural wall reemoval, bath room remodel. interior painting, minor interior drywall patching. note: no sq. ft. change nor exterior building envelope. | $8,500 |
| Jun 12, 2009 | Completed final sign-off Feb 2011 | 421 Moraga St | revision to pa# 2007-1206-9782/s1-2 bedrooms & 2 bathrooms in new layout. no change to approved exterior envelope or opening.Details
revision to pa# 2007-1206-9782/s1-2 bedrooms & 2 bathrooms in new layout. no change to approved exterior envelope or opening. | $500 |
| Jul 1, 2008 | Completed final sign-off Oct 2008 | 230 Stonecrest Dr | kitchen renovation, replace cabinets, countertops, flooring, sink and light. remove existing wall between kitchen and dinning room. bath removation @ 2nd floor, replace, tub, vanity sink and flooring.Details
kitchen renovation, replace cabinets, countertops, flooring, sink and light. remove existing wall between kitchen and dinning room. bath removation @ 2nd floor, replace, tub, vanity sink and flooring. | $15,000 |
| May 16, 2008 | Completed final sign-off Dec 2008 | 1722 Grant Av | interior renovation, kitchen & bathroom remodel, lighting, cabinets, painting, drywall finishes, insulation to all (e) walls. mep & elect. under separate permit. windows replaced, same size, same location.Details
interior renovation, kitchen & bathroom remodel, lighting, cabinets, painting, drywall finishes, insulation to all (e) walls. mep & elect. under separate permit. windows replaced, same size, same location. | $60,000 |