Block 2719B, lot 005
130 Graystone Ter
- City’s use
- Multi-Family Residential
- Built
- 1951
- Stories
- 8
- Units
- 12
- Rooms
- 11 bedrooms, 13 bathrooms
- Building
- 9,181 sq ft
- Lot
- 9,121 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 4, 2021 | Completed final sign-off Jul 2021 | 130 Graystone Tr | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffd section 103.7.6.1 and include sprinkler monitoring. ref. sprinkler #2020-0220-4410Details
upgrade existing fire alarm system to comply with sffd section 103.7.6.1 and include sprinkler monitoring. ref. sprinkler #2020-0220-4410 | $18,000 |
| Dec 15, 2020 | Completed final sign-off Jul 2021 | 130 Graystone Tr | Good Neighbor Construction | revision to pa# 201702038561. at new unit #2a, relocate kitchen & dining. reconfigure bathroom layout. at new unit #3a & #5a, add new window, & new electrical wall heaters.Details
revision to pa# 201702038561. at new unit #2a, relocate kitchen & dining. reconfigure bathroom layout. at new unit #3a & #5a, add new window, & new electrical wall heaters. | $5,000 |
| Feb 20, 2020 | Completed final sign-off Jul 2021 | 130 Graystone Tr | All Star Fire Protection Llc | 1)installation of new fire sprinklers in 3 new units including throuhout stairways(egress) 2)installation of new 2" fire dedicated underground and riser. note: bldg app#201702038561Details
1)installation of new fire sprinklers in 3 new units including throuhout stairways(egress) 2)installation of new 2" fire dedicated underground and riser. note: bldg app#201702038561 | $17,500 |
| Feb 14, 2019 | Completed final sign-off Feb 2019 | 130 Graystone Tr | New City Construction Group Inc | reroofingDetails
reroofing | $12,800 |
| Feb 3, 2017 | Completed final sign-off Jul 2021 | 130 Graystone Tr | Good Neighbor Construction | ****adu per ordinance# 162-16. refer to pa# 2016/04/04/3821. convert (e) storage to 3 dwelling with kitchens, baths, bedrooms & living rooms. 2-one bedroom units & 1- two bedroom unit.Details
****adu per ordinance# 162-16. refer to pa# 2016/04/04/3821. convert (e) storage to 3 dwelling with kitchens, baths, bedrooms & living rooms. 2-one bedroom units & 1- two bedroom unit. | $30,000 |
| Nov 28, 2016 | Completed final sign-off Dec 2016 | 130 Graystone Tr | amend for administrative purpose to change permit from unit #2 to unit #1. revision of pa#2016 1005 9591Details
amend for administrative purpose to change permit from unit #2 to unit #1. revision of pa#2016 1005 9591 | ||
| Oct 5, 2016 | Never finaled issued Oct 2016, no final | 130 Graystone Tr | apartment #2: repair wood balcony joists in-kind.Details
apartment #2: repair wood balcony joists in-kind. | $3,000 | |
| Aug 8, 2016 | Completed final sign-off Sep 2016 | 130 Graystone Tr | apt #3. remodel kitchen, remove old cabinets and counter tops and put in new. no change on wallDetails
apt #3. remodel kitchen, remove old cabinets and counter tops and put in new. no change on wall | $5,000 | |
| Apr 4, 2016 | Completed final sign-off Dec 2016 | 130 Graystone Tr | Good Neighbor Construction | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4 | $20,000 |
| Jan 18, 2011 | Completed final sign-off Apr 2011 | 130 Graystone Tr | T Bailey Construction | unit 4 remove deckboards, repair ex framing, replace with new deck boards, reset orig railing. unit 8, remove nad replace ex rooftop deck with new framing adn deck boards, new railing. replace decks in kind, not visible from street, no structural workDetails
unit 4 remove deckboards, repair ex framing, replace with new deck boards, reset orig railing. unit 8, remove nad replace ex rooftop deck with new framing adn deck boards, new railing. replace decks in kind, not visible from street, no structural work | $11,000 |
| Sep 26, 2006 | Expired or cancelled expired Nov 2007 | 130 Graystone Tr | Innovative Windows | replace (e) aluminum with new fibber glass some wood not visible from street. total 7 windows. liv-rm, kitchen-bdrm-bath. unit#9Details
replace (e) aluminum with new fibber glass some wood not visible from street. total 7 windows. liv-rm, kitchen-bdrm-bath. unit#9 | $5,594 |
| Jan 20, 2004 | Completed final sign-off Jan 2004 | 130 Graystone Tr | Excelsior Roofing Company | reroofingDetails
reroofing | $7,500 |
| Sep 26, 2003 | Completed final sign-off Oct 2003 | 130 Graystone Tr | Excelsior Roofing Company | reroofingDetails
reroofing | $6,800 |
| Mar 18, 2002 | Completed final sign-off Jun 2002 | 130 Graystone Tr | Furness Construction | replacing cabinets & counter top.painting,updated outlets at counter tops.Details
replacing cabinets & counter top.painting,updated outlets at counter tops. | $5,500 |
| Jul 26, 2000 | Completed final sign-off Jan 2001 | 130 Graystone Tr | Furness Construction | replace 6 garage doors with roll-ups same size and locationsDetails
replace 6 garage doors with roll-ups same size and locations | $6,000 |
| Jul 5, 2000 | Completed final sign-off Jul 2001 | 130 Graystone Tr | Lingruen Associates | termite work as report 9580aDetails
termite work as report 9580a | $170,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.