Golden State Builders Group Inc
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2024 to Sep 2026
- Last 24 months
- 29 permits filed
32 permits since 2000: 23 completed, 9 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Stairs permits
4 stairs permits: 2 completed, 2 in progress. Typically 0 days from filing to permit and 52 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Oct 2026 | 1000 Carolina St | construct a new exterior side - yard stair system including concrete footing, wood framing, stringers, guardrails, and handrails. tying into existing structure per approved plans. work includes: structural connections, required fire -rated elements and code compliant installation in accordance withDetails
construct a new exterior side - yard stair system including concrete footing, wood framing, stringers, guardrails, and handrails. tying into existing structure per approved plans. work includes: structural connections, required fire -rated elements and code compliant installation in accordance with | $15,000 |
| Jul 16, 2026 | In progress issued Jul 2026 | 2447 Chestnut St | repair stairs, flashing and railing, back of property less than 50% repair, repair upper unit only deck slats, less than 50%. no work is street facing. exterior rear stairs less than 50% non street facing.Details
repair stairs, flashing and railing, back of property less than 50% repair, repair upper unit only deck slats, less than 50%. no work is street facing. exterior rear stairs less than 50% non street facing. | $30,000 |
| Jan 16, 2026 | Completed final sign-off Feb 2026 | 3823 Cesar Chavez St | stair 1 deck repair, less than 50% replace w/ new wood in-kind not visible from the street.Details
stair 1 deck repair, less than 50% replace w/ new wood in-kind not visible from the street. | $16,500 |
| Dec 17, 2024 | Completed final sign-off Mar 2025 | 156 Putnam St | install 2 story deck with stairs and guardrailDetails
install 2 story deck with stairs and guardrail | $65,000 |