Back to kitchen remodel contractors
Golden Star Construction
- Based in
- North Hollywood
- On San Francisco permits
- Jul 2019 to Jul 2021
- Last 24 months
- 0 permits filed
14 permits since 2000: 6 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 2 completed, 4 never finaled. Typically 2 days from filing to permit and 256 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 106 Country Club Dr | kitchen remodel, 2 bathrooms remodel, rewire house and upgrade electrical box to 200 ampDetails
kitchen remodel, 2 bathrooms remodel, rewire house and upgrade electrical box to 200 amp | $49,000 |
| Jan 4, 2021 | Completed final sign-off Sep 2021 | 555 14th Av | kitchen & bathroom remodel, change 4 street facing windows, same location/sizeDetails
kitchen & bathroom remodel, change 4 street facing windows, same location/size | $34,000 |
| Jan 4, 2021 | Never finaled issued Jan 2021, no final | 2411 Octavia St | unit 5: bathroom remodel, gfci upgrade, change vanity, upgrade shower; unit 6: bathroom remodel; unit 7: kitchen & bathroom remodelDetails
unit 5: bathroom remodel, gfci upgrade, change vanity, upgrade shower; unit 6: bathroom remodel; unit 7: kitchen & bathroom remodel | $70,000 |
| Oct 7, 2020 | Completed final sign-off Aug 2021 | 30 Junior Tr | adding existing patio (surrounded with exterior walls) to the kitchen area (48 sf). kitchen remodel, (e) bathroom remodel at 2nd fl. add 3 new skylights.Details
adding existing patio (surrounded with exterior walls) to the kitchen area (48 sf). kitchen remodel, (e) bathroom remodel at 2nd fl. add 3 new skylights. | $30,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 50 Midcrest Wy | remodel kitchen, counter top. update electrical and plumbing.Details
remodel kitchen, counter top. update electrical and plumbing. | $24,000 |
| Jul 18, 2019 | Never finaled issued Aug 2019, no final | 33 Chenery St | remodel kitchen and remove small section of e wallDetails
remodel kitchen and remove small section of e wall | $12,000 |