Back to kitchen remodel contractors
Golden One Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2015 to May 2023
- Last 24 months
- 0 permits filed
67 permits since 2000: 36 completed, 20 never finaled, 11 expired or cancelled.
Of the 20 never-finaled permits, 9 are 3 to 5 years old, 11 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 5 completed, 3 never finaled, 1 expired or cancelled. Typically 19 days from filing to permit and 670 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2023 | Completed final sign-off May 2023 | 2550 San Bruno Av | kitchen equipment installation- including 3 new compartment, mop sink, stainless steel table, and stainless steel rack.Details
kitchen equipment installation- including 3 new compartment, mop sink, stainless steel table, and stainless steel rack. | $45,000 |
| Oct 28, 2022 | Never finaled issued Jan 2023, no final | 1068 Pacific Av | 1st flr unit #1068 remodel- relocation of (e) kitchen to bedroom. new bedroom at extg kitchen. remodel (e) bathroom.Details
1st flr unit #1068 remodel- relocation of (e) kitchen to bedroom. new bedroom at extg kitchen. remodel (e) bathroom. | $20,000 |
| Oct 11, 2022 | Completed final sign-off Feb 2023 | 67 Fresno St | unit # 7: bathroom remodel like for like. kitchen remodel like for like. no removal of wallsDetails
unit # 7: bathroom remodel like for like. kitchen remodel like for like. no removal of walls | $3,000 |
| Jun 27, 2022 | Completed final sign-off Oct 2025 | 3965 24th St | remodel two levels, kitchens, add 2 bathrooms, 2 bedrooms, repair stair & deck. replace and paint rear siding; inkind replacement of 11 wood sh windows on the front facade with integral ogee lugsDetails
remodel two levels, kitchens, add 2 bathrooms, 2 bedrooms, repair stair & deck. replace and paint rear siding; inkind replacement of 11 wood sh windows on the front facade with integral ogee lugs | $130,000 |
| Sep 30, 2021 | Never finaled issued Oct 2021, no final | 168 Lake Merced Hill St South St | remodel (e) kitchen @ 2nd fl. install glass sliding door @ ground fl and remove (e) window @ rear.Details
remodel (e) kitchen @ 2nd fl. install glass sliding door @ ground fl and remove (e) window @ rear. | $45,000 |
| May 11, 2021 | Completed final sign-off Dec 2023 | 1430 19th Av | 1st floor -a.d.u. per ordinance 162-16 include 1) reconfigure interior layout include two bedrooms, a living room, kitchen & a 3-fixtures bathroom. 2) add common space (gym), a 3-fixture bathroom and storage. separate submittal for fire sprinkler and structuralDetails
1st floor -a.d.u. per ordinance 162-16 include 1) reconfigure interior layout include two bedrooms, a living room, kitchen & a 3-fixtures bathroom. 2) add common space (gym), a 3-fixture bathroom and storage. separate submittal for fire sprinkler and structural | $50,000 |
| Jul 7, 2020 | Never finaled issued Jul 2020, no final | 4044 Cesar Chavez St | remodel 1 kitchen and 2 bathroom, repairs (e) stairs less than 50%. no structural work under this permit.Details
remodel 1 kitchen and 2 bathroom, repairs (e) stairs less than 50%. no structural work under this permit. | $20,000 |
| Nov 15, 2019 | Completed final sign-off Mar 2022 | 881 Clay St | t.i. improvements speacilty market & limited restaurant update accessibility, restroom, new kitchen & equipments, new wash & prep area, new service counter n/a maherDetails
t.i. improvements speacilty market & limited restaurant update accessibility, restroom, new kitchen & equipments, new wash & prep area, new service counter n/a maher | $70,000 |
| May 2, 2019 | Expired or cancelled expired Oct 2023 | 918 Grant Av | reconfigure interior layout for both unit a & b with 1 bedroom, living room, kitchen & 1 3 fixture bathroom. reconfigure interior stair. turn (e) commercial mezzanine space into common space space for residentialDetails
reconfigure interior layout for both unit a & b with 1 bedroom, living room, kitchen & 1 3 fixture bathroom. reconfigure interior stair. turn (e) commercial mezzanine space into common space space for residential | $40,000 |