Back to kitchen remodel contractors
Golden Hammer
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Jul 2026
- Last 24 months
- 2 permits filed
37 permits since 2000: 34 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 9, 2021 | Completed final sign-off Feb 2026 | 155 Flood Av | addition & remodel at main level for new kitchen, bedroom, full bath, & powder room. addition & remodel to convert to habitable space w/ 2 bedrooms, bathroom, laundry room, & closets. garage & (e) storage to remain, create new mechanical enclosure. new decks at main level in rear w/ stairs to yard.Details
addition & remodel at main level for new kitchen, bedroom, full bath, & powder room. addition & remodel to convert to habitable space w/ 2 bedrooms, bathroom, laundry room, & closets. garage & (e) storage to remain, create new mechanical enclosure. new decks at main level in rear w/ stairs to yard. | $300,000 |
| Jul 25, 2019 | Completed final sign-off Jan 2020 | 524 10th Av | renovation to (e) kitchen and bathroom includes replacement of plumbing fixtures,cabinetry, lights, replace kitchen floorDetails
renovation to (e) kitchen and bathroom includes replacement of plumbing fixtures,cabinetry, lights, replace kitchen floor | $35,000 |
| Sep 29, 2014 | Completed final sign-off Nov 2014 | 3125 Lincoln Wy | to comply with bid nov 201495582 & 201493433; remodel (e) kitchen & recess lights in living room. no change on wall.Details
to comply with bid nov 201495582 & 201493433; remodel (e) kitchen & recess lights in living room. no change on wall. | $9,000 |
| Feb 4, 2011 | Completed final sign-off Jun 2011 | 1421 Felton St | 1) remodel extg kitchen and add new half bath on 2nd floor.2) construct one new bedroom, one new bath, and one new family room on ground floor. 3)replace extg water heater and extg furnace.Details
1) remodel extg kitchen and add new half bath on 2nd floor.2) construct one new bedroom, one new bath, and one new family room on ground floor. 3)replace extg water heater and extg furnace. | $47,092 |
| Jan 7, 2011 | Completed final sign-off Dec 2011 | 638 15th Av | remodel (e) kitchen, and add 1 bath room on 2nd floor. new rear deck and stairs at 2nd floor.Details
remodel (e) kitchen, and add 1 bath room on 2nd floor. new rear deck and stairs at 2nd floor. | $35,000 |
| Aug 17, 2010 | Completed final sign-off Dec 2010 | 572 40th Av | legalize 2 bedrooms hall from (e) social room, remove illegal kitchen at ground floor. remove the tub & shower @ the bathroom at ground.Details
legalize 2 bedrooms hall from (e) social room, remove illegal kitchen at ground floor. remove the tub & shower @ the bathroom at ground. | $15,000 |
| Jan 12, 2009 | Completed final sign-off Mar 2009 | 139 Huntington Dr | remodel kitchen & bathroom, kitchen details-replace new cabinets, counter top, lights, tiles for flr. bathroom details-replace bath tub, sink, toilet, tiles for the walls. basement-build 1 living room, legalize bathroom, bedroom & closets. replace central heater & water heater. comp 200986766-bid.Details
remodel kitchen & bathroom, kitchen details-replace new cabinets, counter top, lights, tiles for flr. bathroom details-replace bath tub, sink, toilet, tiles for the walls. basement-build 1 living room, legalize bathroom, bedroom & closets. replace central heater & water heater. comp 200986766-bid. | $30,000 |
| Feb 23, 2007 | Completed final sign-off Jun 2007 | 1636 Great Hy | comply with nov 200558996. remove kitchen and bath at ground floor. cap utilities at source. remove illegal unit in basementDetails
comply with nov 200558996. remove kitchen and bath at ground floor. cap utilities at source. remove illegal unit in basement | $10,000 |
| Jul 5, 2005 | Completed final sign-off Sep 2005 | 231 Evelyn Wy | remodel (e) kitchen and (e) bathroom.install recess light on living room ceiling.Details
remodel (e) kitchen and (e) bathroom.install recess light on living room ceiling. | $20,000 |