Back to kitchen remodel contractors
Golden Genesis Building Group Corp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2018 to Mar 2021
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 486 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2020 | Completed final sign-off Apr 2022 | 1945 Washington St | unit #302, restoration/repair after fire. work include insulation, sheetrock installation, all plumbing & electrical fixtures replacement, kitchen cabinet replacement. no framing, no change to floor,/wall. no plumbing pipe/electrical wire change. no change to wall layoutDetails
unit #302, restoration/repair after fire. work include insulation, sheetrock installation, all plumbing & electrical fixtures replacement, kitchen cabinet replacement. no framing, no change to floor,/wall. no plumbing pipe/electrical wire change. no change to wall layout | $40,000 |