Back to bathroom remodel contractors
Golden Gate Solar
- Based in
- Daly City
- On San Francisco permits
- May 2017 to Oct 2025
- Last 24 months
- 2 permits filed
52 permits since 2000: 43 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 never finaled. Typically 4 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 1501 28th Av | 1st/fl: revision to no plan pa#2025-0825-3842 1st/fl: remodel bathroom , add one full bath, powder, laundry , wetbar and 2 bedrooms. 2nd/f: bathroom and kitchen. add 2 bathrooms. replace interior finishes and all window per plan (window materials to be vinyl).Details
1st/fl: revision to no plan pa#2025-0825-3842 1st/fl: remodel bathroom , add one full bath, powder, laundry , wetbar and 2 bedrooms. 2nd/f: bathroom and kitchen. add 2 bathrooms. replace interior finishes and all window per plan (window materials to be vinyl). | $160,000 |
| May 2, 2018 | Never finaled issued May 2018, no final | 16 Fairmount St | 1) kitchen remodel: cabinets, backsplash, countertop, and remove walls. 2)bathroom remodel: replace tile, shower, sink & toilet.Details
1) kitchen remodel: cabinets, backsplash, countertop, and remove walls. 2)bathroom remodel: replace tile, shower, sink & toilet. | $22,600 |