Block 1874, lot 001
1501 28th Ave
- City’s use
- Single Family Residential
- Built
- 1927
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,169 sq ft
- Lot
- 2,375 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 17, 2026 | Completed final sign-off Mar 2026 | 1501 28th Av | remove and replace rear fence same loaction. less than 8 ft tall, street facing.Details
remove and replace rear fence same loaction. less than 8 ft tall, street facing. | $6,000 | |
| Nov 14, 2025 | Completed final sign-off Mar 2026 | 1501 28th Av | revision to pa# 202508253842: ref pa# 202510087006. 2f remove interior wall and add 4 skylightsDetails
revision to pa# 202508253842: ref pa# 202510087006. 2f remove interior wall and add 4 skylights | $15,000 | |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 1501 28th Av | Golden Gate Solar | 1st/fl: revision to no plan pa#2025-0825-3842 1st/fl: remodel bathroom , add one full bath, powder, laundry , wetbar and 2 bedrooms. 2nd/f: bathroom and kitchen. add 2 bathrooms. replace interior finishes and all window per plan (window materials to be vinyl).Details
1st/fl: revision to no plan pa#2025-0825-3842 1st/fl: remodel bathroom , add one full bath, powder, laundry , wetbar and 2 bedrooms. 2nd/f: bathroom and kitchen. add 2 bathrooms. replace interior finishes and all window per plan (window materials to be vinyl). | $160,000 |
| Aug 25, 2025 | Completed final sign-off Mar 2026 | 1501 28th Av | 2nd floor: remodel of kitchen and bathroom, replace plaster wall finishes with 5/8 type gyp bd, new electrical wiring. all work in scope of work in kitchen, bathroom and powder room only. kitchen approx 132 sq ft, powder room (toilet only) approx. 15 sq ft. bathroom (tub and sink) approx.35 sq ftDetails
2nd floor: remodel of kitchen and bathroom, replace plaster wall finishes with 5/8 type gyp bd, new electrical wiring. all work in scope of work in kitchen, bathroom and powder room only. kitchen approx 132 sq ft, powder room (toilet only) approx. 15 sq ft. bathroom (tub and sink) approx.35 sq ft | $65,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Golden Gate Solar
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.