Back to kitchen remodel contractors
Golden Bay Remodeling Inc
- Based in
- Pittsburg
- On San Francisco permits
- May 2017 to Feb 2026
- Last 24 months
- 7 permits filed
18 permits since 2000: 12 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 in progress. Typically 21 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2024 | In progress issued Oct 2024 | 359 Green St | unit# 5 - kitchen remodel like for like. bathroom remodel like for like. replace one sliding door and one window not front facing. no removal of wallsDetails
unit# 5 - kitchen remodel like for like. bathroom remodel like for like. replace one sliding door and one window not front facing. no removal of walls | $20,000 |
| Apr 21, 2023 | Completed final sign-off Aug 2023 | 579 Howard St | change of ownership. equipment replacement proposed, equipment utility consumption shall be less than or equal with the (e) equipment. (e) kitchen hood to remain. hood/duct fire suppression system under separate permit. max occ load 49 persons.Details
change of ownership. equipment replacement proposed, equipment utility consumption shall be less than or equal with the (e) equipment. (e) kitchen hood to remain. hood/duct fire suppression system under separate permit. max occ load 49 persons. | |
| Apr 19, 2021 | Completed final sign-off Jun 2021 | 239 San Jose Av | electrical upgrade and repair, replace sub panel at hallway, run new lines to electric meters at basement utility room, proposed stack washer and dryer at kitchen area,vanity and shower to be added at bathroom #2Details
electrical upgrade and repair, replace sub panel at hallway, run new lines to electric meters at basement utility room, proposed stack washer and dryer at kitchen area,vanity and shower to be added at bathroom #2 | $20,000 |
| Apr 19, 2021 | Completed final sign-off Sep 2021 | 241 San Jose Av | electrical upgrade and repair, replace sub panel at hallway, run new lines to electric meters at basement utility room, proposed stack washer and dryer at kitchen area, kitchen remodel, vanity and shower to be added at bathroom #2Details
electrical upgrade and repair, replace sub panel at hallway, run new lines to electric meters at basement utility room, proposed stack washer and dryer at kitchen area, kitchen remodel, vanity and shower to be added at bathroom #2 | $20,000 |
| Apr 19, 2021 | Completed final sign-off Sep 2021 | 237 San Jose Av | electrical upgrade and repair, replace sub panel at hallway, run new lines to electric meters at basement utility room, proposed stack washers and dryer at kitchen area.Details
electrical upgrade and repair, replace sub panel at hallway, run new lines to electric meters at basement utility room, proposed stack washers and dryer at kitchen area. | $20,000 |
| Mar 9, 2021 | Completed final sign-off Nov 2021 | 237 San Jose Av | kitchen and bathroom remodel like for like in kind in one unit.Details
kitchen and bathroom remodel like for like in kind in one unit. | $25,000 |
| Aug 18, 2017 | Completed final sign-off Oct 2017 | 85 Cleary Ct | kitchen and two bathrooms remodel. like for like. replace plumbing in laundry room. upgrade electrical box. no change in walls and openings. high efficacy lightingDetails
kitchen and two bathrooms remodel. like for like. replace plumbing in laundry room. upgrade electrical box. no change in walls and openings. high efficacy lighting | $40,000 |