Back to kitchen remodel contractors
Go Management
- Based in
- Alamo
- On San Francisco permits
- Apr 2019 to Apr 2019
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2019 | Completed final sign-off Dec 2019 | 55 Mason St | to comply with nov #201937441. install dry wall, tape, paint. reinstall plumbing hose, remove & reinstall kitchen sink, cabinets in order to prevent mold due to water damage. replace/repair existing fire rating of building to code. approx 16 sq ft - drywall.Details
to comply with nov #201937441. install dry wall, tape, paint. reinstall plumbing hose, remove & reinstall kitchen sink, cabinets in order to prevent mold due to water damage. replace/repair existing fire rating of building to code. approx 16 sq ft - drywall. | $11,000 |