Back to kitchen remodel contractors
Gnetzer General Contractor
- Based in
- San Francisco
- On San Francisco permits
- May 2021 to Jun 2026
- Last 24 months
- 10 permits filed
17 permits since 2000: 11 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 2 in progress. Typically 27 days from filing to permit and 441 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 3555 Jackson St | unit 6: replacing knob and tube. remodel one kitchen and 2 bathrooms like to like. replacing 7 windows (non-street visible) with same size, location and design. all interior remodel only.Details
unit 6: replacing knob and tube. remodel one kitchen and 2 bathrooms like to like. replacing 7 windows (non-street visible) with same size, location and design. all interior remodel only. | $100,000 |
| Dec 4, 2024 | Completed final sign-off Sep 2025 | 1224 16th Av | replace kitchen cabinets, fixtures & finishes. relocate bathroom & add one more bathroom at 3rd fl. install (n) skylight. reconfigure 3 windows at rear facade 3rd flDetails
replace kitchen cabinets, fixtures & finishes. relocate bathroom & add one more bathroom at 3rd fl. install (n) skylight. reconfigure 3 windows at rear facade 3rd fl | $50,000 |
| Sep 18, 2024 | Completed final sign-off Feb 2026 | 3513 Jackson St | remodel existing kitchen and add a new full bathroom. replace the window and french doors in the rear wall. remove bearing wall and add beam and posts.Details
remodel existing kitchen and add a new full bathroom. replace the window and french doors in the rear wall. remove bearing wall and add beam and posts. | $90,000 |
| Jul 3, 2024 | Completed final sign-off Sep 2026 | 2325 Larkin St | kitchen remodel on 2nd fl. remove (e) kitchen for (n) office room on 1st flDetails
kitchen remodel on 2nd fl. remove (e) kitchen for (n) office room on 1st fl | $30,000 |
| Apr 2, 2024 | Completed final sign-off Sep 2024 | 3925 Washington St | new plan configuration on the 2nd fl; remove load bearing walls. move and remodel the kitchen. fill underneath 2nd fl and add new inteior stairs. no exteior work visible from streetDetails
new plan configuration on the 2nd fl; remove load bearing walls. move and remodel the kitchen. fill underneath 2nd fl and add new inteior stairs. no exteior work visible from street | $120,000 |
| Dec 28, 2022 | In progress issued Jul 2024 | 236 Diamond St | expand footprint of rear portion of building. remodel exterior stair and deck. remove wall at level 3 kitchen. remodel level 2 kitchen. add level 1 bathroom.Details
expand footprint of rear portion of building. remodel exterior stair and deck. remove wall at level 3 kitchen. remodel level 2 kitchen. add level 1 bathroom. | $95,000 |
| May 26, 2021 | Completed final sign-off Dec 2025 | 68 Vienna St | adu legalization at ground flr. comply w/ n.o.v 202174122. replace door with a fire door, make bigger landing at entrance between foyer and garage, bring (e) kitchen to code, bring (e) media room to codeDetails
adu legalization at ground flr. comply w/ n.o.v 202174122. replace door with a fire door, make bigger landing at entrance between foyer and garage, bring (e) kitchen to code, bring (e) media room to code | $10,000 |