Back to kitchen remodel contractors
Globus Builder Inc
- Based in
- North Hollywood
- On San Francisco permits
- Feb 2012 to Mar 2025
- Last 24 months
- 2 permits filed
17 permits since 2000: 12 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 expired or cancelled. Typically 22 days from filing to permit and 297 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2022 | Expired or cancelled expired May 2025 | 780 Darien Wy | partially comply w/complaint 202287234. revert to garage use. main house - french drain, water proofing. remove stairs, close door leading to side yard. (n) bathroom, walkin closet main bedrm. remodel (e) full bathrooms, 1/2 bath & kitchen. remove wall btwn kitchen & breakfast nook. family andDetails
partially comply w/complaint 202287234. revert to garage use. main house - french drain, water proofing. remove stairs, close door leading to side yard. (n) bathroom, walkin closet main bedrm. remodel (e) full bathrooms, 1/2 bath & kitchen. remove wall btwn kitchen & breakfast nook. family and | $65,000 |
| Jun 26, 2020 | Completed final sign-off Oct 2021 | 1966 Pacific Av | unit 301: remodel kitchen, remodel two bathrooms, lighting to modified spaces, remove/add interior wallsDetails
unit 301: remodel kitchen, remodel two bathrooms, lighting to modified spaces, remove/add interior walls | $60,000 |
| Mar 14, 2016 | Completed final sign-off Jan 2017 | 1736 Bryant St | remodel (e) kitchens, bathrooms, install new electrical sub panels, outlets, install new hvac systems, install new insulation, install new headers at openings. add 1 new bathroom in each unit.Details
remodel (e) kitchens, bathrooms, install new electrical sub panels, outlets, install new hvac systems, install new insulation, install new headers at openings. add 1 new bathroom in each unit. | $290,000 |
| Feb 14, 2012 | Completed final sign-off Dec 2012 | 473 Fair Oaks St | widen garage door, convert rear portion of garage level to 295 sq ft of habitable space with 1 full bathroom. new elevator, renovate kitchens in both units. convert half bathroom to laundry room in upper unit. new bathroom in upper unit, foundation repairsDetails
widen garage door, convert rear portion of garage level to 295 sq ft of habitable space with 1 full bathroom. new elevator, renovate kitchens in both units. convert half bathroom to laundry room in upper unit. new bathroom in upper unit, foundation repairs | $97,000 |