Back to bathroom remodel contractors
Global Bay Construction Inc.
- Based in
- Milpitas
- On San Francisco permits
- May 2019 to May 2025
- Last 24 months
- 2 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2025 | Completed final sign-off Aug 2025 | 1401 Silver Av | revision 202401194309:relocation of electrical panel, meter directed toward the street. panel located inside of the building. laundry combo unit added to the bath, revise approved layout. changes to kitchen appliances,sink, gas, plumbing. correction to prev existing fl plan. all work interior.Details
revision 202401194309:relocation of electrical panel, meter directed toward the street. panel located inside of the building. laundry combo unit added to the bath, revise approved layout. changes to kitchen appliances,sink, gas, plumbing. correction to prev existing fl plan. all work interior. | |
| May 6, 2019 | Completed final sign-off Jul 2019 | 432 Collingwood St | revision to pa#2019-0503-9663. replace kitchen cabinet & sink, same location. replace front bathroom same location.Details
revision to pa#2019-0503-9663. replace kitchen cabinet & sink, same location. replace front bathroom same location. | $20,000 |