Global Bay Construction Inc.
- Based in
- Milpitas
- On San Francisco permits
- May 2019 to May 2025
- Last 24 months
- 2 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2025 | Completed final sign-off Aug 2025 | 1401 Silver Av | install split air conditioner to provide heat to the unit. reference pa#202504154474 & 202401194309.Details
install split air conditioner to provide heat to the unit. reference pa#202504154474 & 202401194309. | $5,000 |
| Apr 15, 2025 | Completed final sign-off Aug 2025 | 1401 Silver Av | revision 202401194309:relocation of electrical panel, meter directed toward the street. panel located inside of the building. laundry combo unit added to the bath, revise approved layout. changes to kitchen appliances,sink, gas, plumbing. correction to prev existing fl plan. all work interior.Details
revision 202401194309:relocation of electrical panel, meter directed toward the street. panel located inside of the building. laundry combo unit added to the bath, revise approved layout. changes to kitchen appliances,sink, gas, plumbing. correction to prev existing fl plan. all work interior. | |
| Jul 22, 2022 | Completed final sign-off Dec 2022 | 8100 Oceanview Tr | unit #322: kitchen remodeling. non structure work. replacing kitchen cabinets, countertop and bar-top only. no plumbing or adding plumbing fixturesDetails
unit #322: kitchen remodeling. non structure work. replacing kitchen cabinets, countertop and bar-top only. no plumbing or adding plumbing fixtures | $23,000 |
| May 6, 2019 | Completed final sign-off Jul 2019 | 432 Collingwood St | revision to pa#2019-0503-9663. replace kitchen cabinet & sink, same location. replace front bathroom same location.Details
revision to pa#2019-0503-9663. replace kitchen cabinet & sink, same location. replace front bathroom same location. | $20,000 |
| May 3, 2019 | Completed final sign-off Jul 2019 | 432 Collingwood St | replace flooring with vinyl throughout house. paint interior white.Details
replace flooring with vinyl throughout house. paint interior white. | $6,000 |