Back to kitchen remodel contractors
Glen George Rupiper Construction
- Based in
- Petaluma
- On San Francisco permits
- Oct 2007 to Nov 2007
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2007 | Completed final sign-off Apr 2008 | 501 Octavia St | kitchen area: unit# 2 replace 6 wall cabinets & 5 base cab for new style include counter top. sink, faucet. unit# 2, #3 & #5: replace 40 sq. ft. ceremic floor. install new style (repaint all units). bathroom area: unit# 2, #3 & #5. replace shower unclosure ceramic tile & install new ceramic tile.Details
kitchen area: unit# 2 replace 6 wall cabinets & 5 base cab for new style include counter top. sink, faucet. unit# 2, #3 & #5: replace 40 sq. ft. ceremic floor. install new style (repaint all units). bathroom area: unit# 2, #3 & #5. replace shower unclosure ceramic tile & install new ceramic tile. | $17,000 |
| Oct 3, 2007 | Completed final sign-off Apr 2008 | 501 Octavia St | work on unit#4. kitchen: replace 4 wall cabinets and 3 base cabinets only. replaced vinyl floor (60 sf) and install ceramic floor.Details
work on unit#4. kitchen: replace 4 wall cabinets and 3 base cabinets only. replaced vinyl floor (60 sf) and install ceramic floor. | $10,000 |