Glc And Company
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Dec 2021
- Last 24 months
- 0 permits filed
112 permits since 2000: 97 completed, 12 never finaled, 3 expired or cancelled.
Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 7 completed. Typically 22 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2018 | Completed final sign-off Aug 2019 | 1378 Portola Dr | add deck with stairs at rear.Details
add deck with stairs at rear. | $3,500 |
| May 19, 2015 | Completed final sign-off Mar 2016 | 118 Woodland Av | remodel deining, living rm, kitchen, family rm, enlarge door to deck, reconfigure stair from 4th lvel at grade to 3rd level below. remodel 3rd fl bath, replacd front windows in kind. replace front door. enclose existing lightwell. not visible from neighbor or streetDetails
remodel deining, living rm, kitchen, family rm, enlarge door to deck, reconfigure stair from 4th lvel at grade to 3rd level below. remodel 3rd fl bath, replacd front windows in kind. replace front door. enclose existing lightwell. not visible from neighbor or street | $49,500 |
| May 8, 2015 | Completed final sign-off Nov 2015 | 231 24th Av | remove existing sunroom at 2nd and 3rd fl. existing 2nd floor sunroom framing to remain. new deck at rearDetails
remove existing sunroom at 2nd and 3rd fl. existing 2nd floor sunroom framing to remain. new deck at rear | $8,000 |
| Mar 25, 2015 | Completed final sign-off Jan 2016 | 231 24th Av | remodel 2 units: repair/upgrade/enclose (e) lightwell, ext deck & stairwell,handrail, guardrails. replace windows with (n) same size windows in (e) locations, add egress windows as req. repair in kind ext surfaces. 1st flr: convert(e) play rm, storage & 1/2 bath to (n) bedrm. replace foundation.Details
remodel 2 units: repair/upgrade/enclose (e) lightwell, ext deck & stairwell,handrail, guardrails. replace windows with (n) same size windows in (e) locations, add egress windows as req. repair in kind ext surfaces. 1st flr: convert(e) play rm, storage & 1/2 bath to (n) bedrm. replace foundation. | $20,000 |
| Jun 17, 2014 | Completed final sign-off Apr 2015 | 1775 34th Av | new den, family room, study & bathroom @ 1st floor. relocate (e) laundry area & water heater & furnace. relcoate (e) deck & stair less than 30" height. relcoate (e) skylight & replace kitchen window w/garden window. remove wall between kitchen & dining room.Details
new den, family room, study & bathroom @ 1st floor. relocate (e) laundry area & water heater & furnace. relcoate (e) deck & stair less than 30" height. relcoate (e) skylight & replace kitchen window w/garden window. remove wall between kitchen & dining room. | $40,000 |
| Jul 13, 2011 | Completed final sign-off Nov 2012 | 575 16th Av | construct one (n) bath on ground flr, enclose (e) open space under 1st flr to (n) storage with (n) foundation. construct (n) rear deck on 1st floor. remodel kitchen & remove (e) wall bet kitchen & dining room. modify (e) interior stair. convert 1/2 bath to full bath on 1st floor.Details
construct one (n) bath on ground flr, enclose (e) open space under 1st flr to (n) storage with (n) foundation. construct (n) rear deck on 1st floor. remodel kitchen & remove (e) wall bet kitchen & dining room. modify (e) interior stair. convert 1/2 bath to full bath on 1st floor. | $30,000 |
| Dec 4, 2008 | Completed final sign-off Dec 2010 | 118 Woodland Av | horizontal addition -work include complete renovation of the second level add new office & living room, new exterior door & window, plbg fixtures & finishes and including a new deck of 2nd level; replacement decks on the 3rd & 4th levels;Details
horizontal addition -work include complete renovation of the second level add new office & living room, new exterior door & window, plbg fixtures & finishes and including a new deck of 2nd level; replacement decks on the 3rd & 4th levels; | $30,000 |