Back to bathroom remodel contractors
Glc And Company
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Dec 2021
- Last 24 months
- 0 permits filed
112 permits since 2000: 97 completed, 12 never finaled, 3 expired or cancelled.
Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
62 bathroom remodel permits: 56 completed, 6 never finaled. Typically 0 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2021 | Completed final sign-off Aug 2022 | 170 Pfeiffer St | remodel kitchen in kind in unit a & b,remodel powder room in kind in pethouse, remodel master bath & hallway bath in kind in pethouse. no structural work, remodel unit a: one bathroom and kitchen finishes replaced. remodel unit b: one bathroom & kitchen finishes replaced.Details
remodel kitchen in kind in unit a & b,remodel powder room in kind in pethouse, remodel master bath & hallway bath in kind in pethouse. no structural work, remodel unit a: one bathroom and kitchen finishes replaced. remodel unit b: one bathroom & kitchen finishes replaced. | $65,000 |
| Mar 11, 2021 | Completed final sign-off Jun 2021 | 3042 Gough St | to perform exploratory demo on closet and pantry for bathroom remodel. remove and replace approx. 200 sq ft. or wall finishes.Details
to perform exploratory demo on closet and pantry for bathroom remodel. remove and replace approx. 200 sq ft. or wall finishes. | $1,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 3042 Gough St | add a full bathroom to rear bedroom (upper unit). widen (e) cased openings .Details
add a full bathroom to rear bedroom (upper unit). widen (e) cased openings . | $30,000 |
| Dec 23, 2020 | Completed final sign-off Apr 2021 | 1905 Laguna St | #104: kitchen remodel in kind. replace cabinets & countertops. bathroom remodel in kind. replace bathroom tile & finishes. no structural work performed.Details
#104: kitchen remodel in kind. replace cabinets & countertops. bathroom remodel in kind. replace bathroom tile & finishes. no structural work performed. | $20,000 |
| Oct 29, 2020 | Completed final sign-off Dec 2021 | 1775 Oak St | top level: renovate 1 kitchen & 1 bathroom, new beam/opening between dining & kitchen. add a full bathroom. add 1 skylightDetails
top level: renovate 1 kitchen & 1 bathroom, new beam/opening between dining & kitchen. add a full bathroom. add 1 skylight | $75,000 |
| Feb 24, 2020 | Completed final sign-off Sep 2020 | 3 Burnett Ave North Av | (building b)beam in kitchen. renovate kitchen. renovate master bathroom.Details
(building b)beam in kitchen. renovate kitchen. renovate master bathroom. | $100,000 |
| Jan 22, 2020 | Completed final sign-off Feb 2021 | 2032 Green St | kitchen and bath remodel, new beam in kitchen, laundry in closet (n) closet doorDetails
kitchen and bath remodel, new beam in kitchen, laundry in closet (n) closet door | $100,000 |
| Oct 11, 2019 | Completed final sign-off Jul 2021 | 831 27th Av | interior remodelto upgrade kitchen & bathrooms. in each unit. (replace front facade windows in kind under separate permit).Details
interior remodelto upgrade kitchen & bathrooms. in each unit. (replace front facade windows in kind under separate permit). | $140,000 |
| Aug 29, 2019 | Completed final sign-off Jul 2020 | 819 24th Av | remodel/relocate 2nd fl kitchen & powder room. remodel 3rd fl. bath, add hallway, add bathDetails
remodel/relocate 2nd fl kitchen & powder room. remodel 3rd fl. bath, add hallway, add bath | $150,000 |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 287 28th Av | remodel master bathroom in kind. relocate main subpanel w/ in garage.Details
remodel master bathroom in kind. relocate main subpanel w/ in garage. | $18,000 |
| Jun 12, 2019 | Completed final sign-off Mar 2022 | 138 Arguello Bl | remodel existing kitchen in place, remodel rear sitting room with new/replcement windows and doors. new skylights, replace exiting dinning room french doors and side lights with new. remodel exiting 1/2 bathroom in place.Details
remodel existing kitchen in place, remodel rear sitting room with new/replcement windows and doors. new skylights, replace exiting dinning room french doors and side lights with new. remodel exiting 1/2 bathroom in place. | $75,000 |
| Jun 4, 2019 | Completed final sign-off Aug 2019 | 279 Oak Park Dr | remodel 3rd floor bathroom in kind. no wall removalDetails
remodel 3rd floor bathroom in kind. no wall removal | $11,000 |
| Sep 7, 2018 | Completed final sign-off Aug 2019 | 65 Ina Ct | 1st flr - add 1 bedroom, 1 full bath, laundry and media roomDetails
1st flr - add 1 bedroom, 1 full bath, laundry and media room | $45,000 |
| Aug 8, 2018 | Completed final sign-off Nov 2018 | 3819 18th St | #1: remodel kitchen & bathroom in kind. new electrical in unit (wire/subpanel). 1 new replacement window in bathroom, 1 new replacement window in kitchen. no walls moved, removed, added or infilled, all existing layout to remain unchanged.Details
#1: remodel kitchen & bathroom in kind. new electrical in unit (wire/subpanel). 1 new replacement window in bathroom, 1 new replacement window in kitchen. no walls moved, removed, added or infilled, all existing layout to remain unchanged. | $20,000 |
| Aug 8, 2018 | Completed final sign-off Feb 2019 | 207 Munich St | no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. remodel kitchen and bathroom in kind, updating electrical in the entire unit. replacing 1 living room window- visiblle from street - fixed or ctr light w/casement on either side. 1 bedrm, 1 garage - front facing alumDetails
no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. remodel kitchen and bathroom in kind, updating electrical in the entire unit. replacing 1 living room window- visiblle from street - fixed or ctr light w/casement on either side. 1 bedrm, 1 garage - front facing alum | $35,000 |
| Jul 23, 2018 | Completed final sign-off Nov 2018 | 156 Midcrest Wy | remodel 2nd floor hall bathroom in kind, replace w/ new shower pan and new tub. everything in same locationDetails
remodel 2nd floor hall bathroom in kind, replace w/ new shower pan and new tub. everything in same location | $10,000 |
| May 4, 2018 | Completed final sign-off Jul 2018 | 110 Steiner St | add new full bathroom on ground floor behind garage.Details
add new full bathroom on ground floor behind garage. | $14,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 722 Sunnydale Av | kitchen and bathroom remodel. sheetrock replacement, install tile floors at kitchen and bathroom, new shower, toilet, vanity, 3 new windows at rear, light fixtures, new roof.Details
kitchen and bathroom remodel. sheetrock replacement, install tile floors at kitchen and bathroom, new shower, toilet, vanity, 3 new windows at rear, light fixtures, new roof. | $10,000 |
| Apr 5, 2018 | Completed final sign-off Jun 2018 | 403 34th Av | remodel kitchen in-kind, replace bathroom shower tiles/shower pan, waterproofing. no structural work/wall modification/wall removal.Details
remodel kitchen in-kind, replace bathroom shower tiles/shower pan, waterproofing. no structural work/wall modification/wall removal. | $20,000 |
| Feb 12, 2018 | Completed final sign-off Jun 2018 | 1211 Shafter Av | remodel ground floor (1) bathroom; (2) second floor bathrooms and kitchen in kind. n/a maherDetails
remodel ground floor (1) bathroom; (2) second floor bathrooms and kitchen in kind. n/a maher | $40,000 |
| Dec 29, 2017 | Completed final sign-off Jun 2018 | 2334 Pine St | 2nd fl kitchen: replace countertops, cabinets. 3rd fl: removel master bath in kindl. replace shower pan and tub. remodel hallway bathroom. replace tile, toilet, vanity, shower pan. 4th fl remodel bath in kind, replace bath in kind. replace tile, toilet, vanity and shower panDetails
2nd fl kitchen: replace countertops, cabinets. 3rd fl: removel master bath in kindl. replace shower pan and tub. remodel hallway bathroom. replace tile, toilet, vanity, shower pan. 4th fl remodel bath in kind, replace bath in kind. replace tile, toilet, vanity and shower pan | $55,000 |
| Nov 15, 2017 | Completed final sign-off Jun 2018 | 324 Joost Av | remodel kitchen on 2nd fl, convert laundry to (n) bathroom. remodel (e) bathroom on 3rd fl. garage reinforcement.Details
remodel kitchen on 2nd fl, convert laundry to (n) bathroom. remodel (e) bathroom on 3rd fl. garage reinforcement. | $60,000 |
| Mar 24, 2017 | Completed final sign-off Sep 2021 | 2420 Taraval St | horizontal & vertical addition @ rear to accomodate (2) additional residential units. proposed interior remodel to 1st fl adding (2)bedrooms,(1)livingroom,(1)bath,(1)kitchen. 2nd fl adding(2)bedroom,(1) master bedroom,(2)baths,(1)kitchen. 3rd fl adding(2)bedrooms,(1)master bedroom,(2)baths,(1)kitchDetails
horizontal & vertical addition @ rear to accomodate (2) additional residential units. proposed interior remodel to 1st fl adding (2)bedrooms,(1)livingroom,(1)bath,(1)kitchen. 2nd fl adding(2)bedroom,(1) master bedroom,(2)baths,(1)kitchen. 3rd fl adding(2)bedrooms,(1)master bedroom,(2)baths,(1)kitch | $425,000 |
| Mar 20, 2017 | Completed final sign-off Jul 2017 | 2658 21st Av | g/f: add 2 bedrooms, family room and 1 full bathroom. 2/f: remodel (e) kitchen and (e) bathroom. add 1 (n) bathroom. infill north and south light well.Details
g/f: add 2 bedrooms, family room and 1 full bathroom. 2/f: remodel (e) kitchen and (e) bathroom. add 1 (n) bathroom. infill north and south light well. | $80,000 |
| Mar 9, 2017 | Completed final sign-off Feb 2018 | 1147 Dolores St | drywall installation in basement crawlspace and deck /fencing at roof. repair weather proofing on siding. install exhaust fan in 3rd floor hallway bathroom. to comply for complaint # 201763161 #2, complaint # 201762927 # 6 & 7Details
drywall installation in basement crawlspace and deck /fencing at roof. repair weather proofing on siding. install exhaust fan in 3rd floor hallway bathroom. to comply for complaint # 201763161 #2, complaint # 201762927 # 6 & 7 | $5,000 |
| Mar 9, 2017 | Completed final sign-off May 2018 | 2927 Pierce St | remodel kitchen, master bathroom with shower pan and hallway bathroom in-kind.Details
remodel kitchen, master bathroom with shower pan and hallway bathroom in-kind. | $60,000 |
| Feb 8, 2017 | Completed final sign-off May 2017 | 376 Chestnut St | remodel master bath in kindDetails
remodel master bath in kind | $23,000 |
| Jan 20, 2017 | Completed final sign-off Jul 2017 | 321 Avila St | remodel 2/f hallway bathroom in-kind.Details
remodel 2/f hallway bathroom in-kind. | $13,000 |
| Jan 20, 2017 | Completed final sign-off May 2017 | 1355 21st Av | remodel (2) bathrooms on ground floor in kind, replace (9) rear old windows with new windows not visible from the frontDetails
remodel (2) bathrooms on ground floor in kind, replace (9) rear old windows with new windows not visible from the front | $25,000 |
| Jul 15, 2016 | Completed final sign-off Jul 2017 | 321 Avila St | 1st fl - add 2 bedroooms, 2 full baths, foundation replaced and basement floor to be lowered by approx. 15" at all areas except (e) garage & utility room to remain. install new radiant heat, kitchen remodelDetails
1st fl - add 2 bedroooms, 2 full baths, foundation replaced and basement floor to be lowered by approx. 15" at all areas except (e) garage & utility room to remain. install new radiant heat, kitchen remodel | $75,000 |
| May 17, 2016 | Completed final sign-off May 2016 | 858 30th Av | revision to pa #201507020600: add new skylights at kitchen, master bathroom & hallway; new bar sink; relocate bathroom & utility room on 2nd floor. reconfigure master bathroom layout on 2nd floor. add new pantry & closet at entry area.Details
revision to pa #201507020600: add new skylights at kitchen, master bathroom & hallway; new bar sink; relocate bathroom & utility room on 2nd floor. reconfigure master bathroom layout on 2nd floor. add new pantry & closet at entry area. | $2,000 |
| Apr 13, 2016 | Never finaled issued Apr 2016, no final | 2027 28th Av | revision to ref pa 2014 1201 2741: remove interior stairway and reconfigure (e) kitchen, add new sink at kitchen, add new skylight at hallway, replace skylight at lightwell and bathroom. infill approx 17 sf at lightwell. replace window at rear side of bld on 2ndDetails
revision to ref pa 2014 1201 2741: remove interior stairway and reconfigure (e) kitchen, add new sink at kitchen, add new skylight at hallway, replace skylight at lightwell and bathroom. infill approx 17 sf at lightwell. replace window at rear side of bld on 2nd | $7,000 |
| Nov 4, 2015 | Completed final sign-off Jan 2016 | 231 24th Av | revision to 201505085867, 201503251894. relocate 3rd fl unit to 1st fl. relocate skylight on 3rd fl. reconfigure stairway on 2nd and 3rd fl. revise master bath, walkincloset layout on 3rd fl per plan. revise kitchen layout and add new bar sink on 2nd flDetails
revision to 201505085867, 201503251894. relocate 3rd fl unit to 1st fl. relocate skylight on 3rd fl. reconfigure stairway on 2nd and 3rd fl. revise master bath, walkincloset layout on 3rd fl per plan. revise kitchen layout and add new bar sink on 2nd fl | |
| Aug 26, 2015 | Completed final sign-off Sep 2016 | 229 Summit St | add one full bath on 1st flr, turn (e) tool room into entertainment room per plan.Details
add one full bath on 1st flr, turn (e) tool room into entertainment room per plan. | $30,000 |
| Aug 20, 2015 | Completed final sign-off Aug 2015 | 373 15th Av | legalized shower in (e) bathroom closet. no walls to be altered.Details
legalized shower in (e) bathroom closet. no walls to be altered. | $1,500 |
| Aug 5, 2015 | Completed final sign-off Apr 2016 | 55 Maddux Av | add two bedrooms, one bathroom, & utility/mudroom on 1st floor per plan.Details
add two bedrooms, one bathroom, & utility/mudroom on 1st floor per plan. | $25,000 |
| Jul 2, 2015 | Completed final sign-off May 2016 | 858 30th Av | add new family room, bedroom & bathroom at 1st floor. replace (e) furnace & water heater. relocate (e) kitchen & dining room at 2nd floor. remodle (e) bathroom & add new bathroom at 2nd floor. replace windows throughout bldg. relocate stairway connect 1st & 2nd floor.Details
add new family room, bedroom & bathroom at 1st floor. replace (e) furnace & water heater. relocate (e) kitchen & dining room at 2nd floor. remodle (e) bathroom & add new bathroom at 2nd floor. replace windows throughout bldg. relocate stairway connect 1st & 2nd floor. | $36,000 |
| May 19, 2015 | Completed final sign-off Mar 2016 | 118 Woodland Av | remodel deining, living rm, kitchen, family rm, enlarge door to deck, reconfigure stair from 4th lvel at grade to 3rd level below. remodel 3rd fl bath, replacd front windows in kind. replace front door. enclose existing lightwell. not visible from neighbor or streetDetails
remodel deining, living rm, kitchen, family rm, enlarge door to deck, reconfigure stair from 4th lvel at grade to 3rd level below. remodel 3rd fl bath, replacd front windows in kind. replace front door. enclose existing lightwell. not visible from neighbor or street | $49,500 |
| Mar 27, 2015 | Completed final sign-off May 2016 | 858 30th Av | remodel (e) kitchen and hallway bathroom in-kind. no walls moved, removed or added. all (e) layout to remain unchanged.Details
remodel (e) kitchen and hallway bathroom in-kind. no walls moved, removed or added. all (e) layout to remain unchanged. | $24,000 |
| Mar 25, 2015 | Completed final sign-off Jan 2016 | 231 24th Av | remodel 2 units: repair/upgrade/enclose (e) lightwell, ext deck & stairwell,handrail, guardrails. replace windows with (n) same size windows in (e) locations, add egress windows as req. repair in kind ext surfaces. 1st flr: convert(e) play rm, storage & 1/2 bath to (n) bedrm. replace foundation.Details
remodel 2 units: repair/upgrade/enclose (e) lightwell, ext deck & stairwell,handrail, guardrails. replace windows with (n) same size windows in (e) locations, add egress windows as req. repair in kind ext surfaces. 1st flr: convert(e) play rm, storage & 1/2 bath to (n) bedrm. replace foundation. | $20,000 |
| Feb 10, 2015 | Completed final sign-off Jan 2016 | 231 24th Av | remodel one kitchen and 2 bathroom in each unit in kind. total 4 bathrooms and 2 kitchens.Details
remodel one kitchen and 2 bathroom in each unit in kind. total 4 bathrooms and 2 kitchens. | $54,600 |
| Dec 1, 2014 | Never finaled issued Dec 2014, no final | 2027 28th Av | remodel e bedroom and laundry area on gr floor. remodel e bath and kitchen on 2nd fl, add new 1/2 bath on 2nd flDetails
remodel e bedroom and laundry area on gr floor. remodel e bath and kitchen on 2nd fl, add new 1/2 bath on 2nd fl | $26,000 |
| Jun 18, 2014 | Completed final sign-off Jul 2016 | 838 27th Av | 2/f bathroom remodel, remodel bathroom in kind, remodel 1 shower pan, 1 tub & 1 toilet & 1 sink. no structural work.Details
2/f bathroom remodel, remodel bathroom in kind, remodel 1 shower pan, 1 tub & 1 toilet & 1 sink. no structural work. | $10,000 |
| Jun 17, 2014 | Completed final sign-off Apr 2015 | 1775 34th Av | new den, family room, study & bathroom @ 1st floor. relocate (e) laundry area & water heater & furnace. relcoate (e) deck & stair less than 30" height. relcoate (e) skylight & replace kitchen window w/garden window. remove wall between kitchen & dining room.Details
new den, family room, study & bathroom @ 1st floor. relocate (e) laundry area & water heater & furnace. relcoate (e) deck & stair less than 30" height. relcoate (e) skylight & replace kitchen window w/garden window. remove wall between kitchen & dining room. | $40,000 |
| Jun 13, 2014 | Completed final sign-off Apr 2015 | 1775 34th Av | remodel (1) kitchen & bathroom & master bathroom.Details
remodel (1) kitchen & bathroom & master bathroom. | $20,000 |
| Apr 25, 2014 | Completed final sign-off Jul 2016 | 838 27th Av | enlarge existing bathroom on ground floor. remodel (e) kitchen on 2nd floor. remove wall between kitchen and dining.Details
enlarge existing bathroom on ground floor. remodel (e) kitchen on 2nd floor. remove wall between kitchen and dining. | $30,000 |
| Apr 7, 2014 | Completed final sign-off Mar 2015 | 1908 Lake St | kitchen and bathroom remodel in kind. all new finishes.Details
kitchen and bathroom remodel in kind. all new finishes. | $23,000 |
| Apr 3, 2014 | Completed final sign-off Jul 2016 | 2537 22nd Av | kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work.Details
kitchen and bathroom remodel. to comply with notice of violation # 201457251. replace in -kind, not structural work. | $6,000 |
| Jan 17, 2014 | Completed final sign-off Nov 2017 | 2420 Taraval St | remodel existing kitchen in kind and 2 baths (one on 3rd and one on 2nd flr) repair dry rot @ front staircase, replacing stair stringer, less than 50% replacementDetails
remodel existing kitchen in kind and 2 baths (one on 3rd and one on 2nd flr) repair dry rot @ front staircase, replacing stair stringer, less than 50% replacement | $27,000 |
| Jan 6, 2014 | Completed final sign-off Dec 2014 | 3727 21st St | 2 bathroom remodels in kind. replace 1 tub and 1 shower pan and all finishesDetails
2 bathroom remodels in kind. replace 1 tub and 1 shower pan and all finishes | $20,000 |
| Nov 21, 2013 | Completed final sign-off Dec 2013 | 1 Baker St | remodel bathroom in hallway inkind - replace tub toilet, vanit and all tilework. relocate one light and replace exhaust fan 56 sq ft. work in unit 6c onlyDetails
remodel bathroom in hallway inkind - replace tub toilet, vanit and all tilework. relocate one light and replace exhaust fan 56 sq ft. work in unit 6c only | $9,000 |
| Jun 26, 2013 | Never finaled issued Jun 2013, no final | 2079 17th Av | comply with nov# 201303944-repair damage drywall moulding in bathroom, replace toilet, install outlets in living room & kitchen.Details
comply with nov# 201303944-repair damage drywall moulding in bathroom, replace toilet, install outlets in living room & kitchen. | $500 |
| Apr 1, 2013 | Completed final sign-off Sep 2013 | 376 Chestnut St | kitchen remodel in kind & bathroom remodel in kind & replace 6 rear windows, not visible from street. u factor max is 0.40. new recess lights in kitchen. comply with cec 150(n) for lighting.Details
kitchen remodel in kind & bathroom remodel in kind & replace 6 rear windows, not visible from street. u factor max is 0.40. new recess lights in kitchen. comply with cec 150(n) for lighting. | $25,000 |
| May 31, 2012 | Completed final sign-off Jul 2012 | 616 08th Av | convert (e) storage room into entertainment room, add half bathroom at entertainment room on 1st floor (garage)Details
convert (e) storage room into entertainment room, add half bathroom at entertainment room on 1st floor (garage) | $12,000 |
| Mar 6, 2012 | Never finaled issued Mar 2012, no final | 3990 Folsom St | kitchen remodel (1) 2nd floor, bathroom remodel at ground floor. new code compliant stairs. install new skylights on 2nd floor.Details
kitchen remodel (1) 2nd floor, bathroom remodel at ground floor. new code compliant stairs. install new skylights on 2nd floor. | $50,000 |
| Feb 16, 2012 | Completed final sign-off Jun 2012 | 29 Palm Av | #3, #4- kitchen/bathroom in kind. remove kitchen cabinets/floor, new electrical wiring, 4 recess lights. reinstall cabinets/counter/floor tiles. no structural work, remove bathroom tub, vanity & toilet. new tile floor/walls, reinstall vanity, tolet & tub @ both unit. (n) lighting comply cec150(k)Details
#3, #4- kitchen/bathroom in kind. remove kitchen cabinets/floor, new electrical wiring, 4 recess lights. reinstall cabinets/counter/floor tiles. no structural work, remove bathroom tub, vanity & toilet. new tile floor/walls, reinstall vanity, tolet & tub @ both unit. (n) lighting comply cec150(k) | $30,000 |
| Aug 18, 2011 | Completed final sign-off Feb 2012 | 1731 Stockton St | interior remodel only of kitchen/dining room,bathroom and master closet. structural work to include a new large opening between kitchen and dining room.Details
interior remodel only of kitchen/dining room,bathroom and master closet. structural work to include a new large opening between kitchen and dining room. | $41,000 |
| Jul 13, 2011 | Completed final sign-off Nov 2012 | 575 16th Av | construct one (n) bath on ground flr, enclose (e) open space under 1st flr to (n) storage with (n) foundation. construct (n) rear deck on 1st floor. remodel kitchen & remove (e) wall bet kitchen & dining room. modify (e) interior stair. convert 1/2 bath to full bath on 1st floor.Details
construct one (n) bath on ground flr, enclose (e) open space under 1st flr to (n) storage with (n) foundation. construct (n) rear deck on 1st floor. remodel kitchen & remove (e) wall bet kitchen & dining room. modify (e) interior stair. convert 1/2 bath to full bath on 1st floor. | $30,000 |
| Mar 17, 2011 | Completed final sign-off Jul 2016 | 225 Santa Ana Av | 2'-00" vertical addition @ 1st floor. renovate (e) crawl space & garage for 2 bedrooms, den, 2 baths, living area @ 1st floor. renovate (e) kitchen @ 2nd floor - 2nd floor, 17 sq. ft. addition @ master bath. new stair @ entrance, new entrance for 1st floor.Details
2'-00" vertical addition @ 1st floor. renovate (e) crawl space & garage for 2 bedrooms, den, 2 baths, living area @ 1st floor. renovate (e) kitchen @ 2nd floor - 2nd floor, 17 sq. ft. addition @ master bath. new stair @ entrance, new entrance for 1st floor. | $128,000 |
| Feb 11, 2011 | Completed final sign-off May 2011 | 1810 09th Av | kitchen & bathroom remodel as like, kitchen (14x8) upgrade electrical wiring, check plumbing, sheetrock, cabinets, counter top, tile work finish. bath: electrical work, update plumbing sheetrock, shower pan, vanity counter tile work, finish (5x7) lighting changes must comply w/cec 150(k)Details
kitchen & bathroom remodel as like, kitchen (14x8) upgrade electrical wiring, check plumbing, sheetrock, cabinets, counter top, tile work finish. bath: electrical work, update plumbing sheetrock, shower pan, vanity counter tile work, finish (5x7) lighting changes must comply w/cec 150(k) | $20,000 |
| Nov 8, 2010 | Completed final sign-off Jan 2011 | 1501 La Salle Av | reconfigure (e) bedroom and new storage at first floor. remodel (e) kitchen, bathroom and closets at 2nd floor.Details
reconfigure (e) bedroom and new storage at first floor. remodel (e) kitchen, bathroom and closets at 2nd floor. | $27,000 |
| Jun 11, 2010 | Completed final sign-off Oct 2010 | 4326 24th St | remodel bathroom as like; replace tiles, lights, fixtures & replace bathroom shower pan.Details
remodel bathroom as like; replace tiles, lights, fixtures & replace bathroom shower pan. | $10,000 |