Back to bathroom remodel contractors
Glam Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2018 to Jun 2026
- Last 24 months
- 53 permits filed
119 permits since 2000: 111 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 8 completed, 3 never finaled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2024 | Completed final sign-off Nov 2024 | 579 Athens St | kitchen remodel in kind (n) cabinets & countertop replacement. two bathroom fixture replacementDetails
kitchen remodel in kind (n) cabinets & countertop replacement. two bathroom fixture replacement | $10,000 |
| Jul 26, 2023 | Completed final sign-off Nov 2023 | 69 Downey St | bathroom remodel in-kind, replacing tub, tile, toilet, and vanity in kind, no floor layout change. no wall layout change. no structural work.Details
bathroom remodel in-kind, replacing tub, tile, toilet, and vanity in kind, no floor layout change. no wall layout change. no structural work. | $55,000 |
| Apr 11, 2023 | Completed final sign-off Apr 2024 | 1958 Vallejo St | remodel bathroom- partial demolition of (2) bathroom no wall alterationDetails
remodel bathroom- partial demolition of (2) bathroom no wall alteration | $10,000 |
| Jun 8, 2022 | Completed final sign-off Dec 2022 | 81 Seal Rock Dr | full bath remodel. infill (e) lightwell, replace (e) skylight w/in-kind. add steam shower upgrade & relocate tub toilet & plumbing. remove (e) window. replace (e) bathrm fan & duct to exterior. partial demo of ceiling & ceiling joist & reframe. plumbing & electrical to code. new interior finishes.Details
full bath remodel. infill (e) lightwell, replace (e) skylight w/in-kind. add steam shower upgrade & relocate tub toilet & plumbing. remove (e) window. replace (e) bathrm fan & duct to exterior. partial demo of ceiling & ceiling joist & reframe. plumbing & electrical to code. new interior finishes. | $10,000 |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 1455 Union St | 5 kitchen remodel (replace cabinets, floors, etc.) 5 bathroom patial remodel (new floor, new fan, sub panel addition @ kitchen) in unit 5, 7, 9, 10, & 11. all work in-kind. no walls moving.Details
5 kitchen remodel (replace cabinets, floors, etc.) 5 bathroom patial remodel (new floor, new fan, sub panel addition @ kitchen) in unit 5, 7, 9, 10, & 11. all work in-kind. no walls moving. | $270,000 |
| Jun 8, 2022 | Completed final sign-off Jul 2022 | 941 Capp St | removal of two non-loadbearing partitions & add (1) bathroom fan.Details
removal of two non-loadbearing partitions & add (1) bathroom fan. | $10,000 |
| Mar 23, 2022 | Completed final sign-off Aug 2022 | 1885 Jackson St | apt# 402: kitchen alteration. addition of laundry center. addition of kitchen island. 2 bathroom alteration.Details
apt# 402: kitchen alteration. addition of laundry center. addition of kitchen island. 2 bathroom alteration. | $42,000 |
| Jun 29, 2020 | Completed final sign-off Jun 2022 | 290 Thrift St | replace damaged subfloor, replace tile, sheetrock, tile wall, replace sink & tub, paint interior, all work inkind. bathroom remodelDetails
replace damaged subfloor, replace tile, sheetrock, tile wall, replace sink & tub, paint interior, all work inkind. bathroom remodel | $3,000 |
| Mar 3, 2020 | Completed final sign-off May 2020 | 1825 Beach St | revision to pa 2020-0114-1836 - reduction of work, no remodel in (e) full bathroom. only work in half bathDetails
revision to pa 2020-0114-1836 - reduction of work, no remodel in (e) full bathroom. only work in half bath | |
| Jan 14, 2020 | Never finaled issued Jan 2020, no final | 1825 Beach St | bathroom remodel and add half bathroom at 2nd floor. no exterior work. non structural demo and framing. no new conditioned space.Details
bathroom remodel and add half bathroom at 2nd floor. no exterior work. non structural demo and framing. no new conditioned space. | $15,000 |
| Jan 11, 2018 | Never finaled issued Aug 2023, no final | 718 Brazil Av | to comply with nov# 201705702 legalize (e) unpermitted areas with horizontal & vertical additions with 1 new bath & sunroom on 3rd floor.Details
to comply with nov# 201705702 legalize (e) unpermitted areas with horizontal & vertical additions with 1 new bath & sunroom on 3rd floor. | $70,000 |