Back to bathroom remodel contractors
Geo M Robinson & Co
- Based in
- San Jose
- On San Francisco permits
- Jan 2000 to Feb 2026
- Last 24 months
- 1 permit filed
226 permits since 2000: 120 completed, 1 in progress, 40 never finaled, 65 expired or cancelled.
Of the 40 never-finaled permits, 3 are 5 to 10 years old, 37 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 5 completed, 3 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2014 | Completed final sign-off Nov 2014 | 126 Post St | first floor: replace 30 pendents. sprinklers with uprights due to ceiling removal. remove 19 (e) drops and add arm overs for new/relocated upright sprinklers in bathrooms. relocate 4 pendents for new walls/ceilings. ref. 2014.0718.1634.Details
first floor: replace 30 pendents. sprinklers with uprights due to ceiling removal. remove 19 (e) drops and add arm overs for new/relocated upright sprinklers in bathrooms. relocate 4 pendents for new walls/ceilings. ref. 2014.0718.1634. | $13,000 |
| Jul 24, 2008 | Completed final sign-off Jan 2009 | 2001 37th Av | installation of new overhead automatic fire sprikler system to new canopy in ex courtyard. system feed from (e) 4" ug up in (e) bathroom, 44 ssp & 19 hsw. total 63 hds.Details
installation of new overhead automatic fire sprikler system to new canopy in ex courtyard. system feed from (e) 4" ug up in (e) bathroom, 44 ssp & 19 hsw. total 63 hds. | $7,750 |
| Jun 25, 2003 | Completed final sign-off Sep 2003 | 590 Brannan St | install 6 heads (ssu) in new relocated canopy. add 2 pendents in new built bath rooms. total 8 headsDetails
install 6 heads (ssu) in new relocated canopy. add 2 pendents in new built bath rooms. total 8 heads | $2,500 |
| Jan 4, 2000 | Never finaled filed Jan 2000, never issued | 2428 14th Av | add bath & 2 bedrms @ground floorDetails
add bath & 2 bedrms @ground floor | $17,000 |
| Jan 4, 2000 | Never finaled filed Jan 2000, never issued | 156 Palm Av | remodel bldg,bsemnt,kitchen, bath &convert recreation rm,Details
remodel bldg,bsemnt,kitchen, bath &convert recreation rm, | $20,000 |
| Jan 4, 2000 | Expired or cancelled expired Sep 2001 | 525 Jersey St | enclosing roof terrace, remodeling bedrooms and bathroomsDetails
enclosing roof terrace, remodeling bedrooms and bathrooms | $140,000 |
| Jan 4, 2000 | Completed final sign-off Jul 2000 | 47 Milton St | build a bedroom, bathroom & starway on ground floorDetails
build a bedroom, bathroom & starway on ground floor | $9,500 |
| Jan 4, 2000 | Completed final sign-off Jul 2000 | 178 Carnelian Wy | remodel: kitchen, bath, liviing roomsDetails
remodel: kitchen, bath, liviing rooms | $12,000 |
| Jan 4, 2000 | Never finaled filed Jan 2000, never issued | 2115 27th Av | add family room & bath @ ground floorDetails
add family room & bath @ ground floor | $3,000 |