Back to kitchen remodel contractors
Gencon Services
- Based in
- Walnut Creek
- On San Francisco permits
- May 2011 to Jul 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2011 | Completed final sign-off Sep 2011 | 23 Delmar St | demo plaster finishes up to 5'-0" and flooring in bathroom then tile bath. add exhaus fam, reinstall plumbing fixtures. sheetrock and replace 3 windows in pantry. replace kitchen cabinets and flooring.Details
demo plaster finishes up to 5'-0" and flooring in bathroom then tile bath. add exhaus fam, reinstall plumbing fixtures. sheetrock and replace 3 windows in pantry. replace kitchen cabinets and flooring. | $7,000 |