Gallieria, Inc/Trico Cons
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to May 2026
- Last 24 months
- 1 permit filed
17 permits since 2000: 12 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 65 days from filing to permit and 329 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2005 | Completed final sign-off Dec 2006 | 981 Howard St | construct new owner toilet rms, 3 stop passenger elevator, new stair from 1st floor to basement. open up 4 previously blocked in windows on 1st fl facing tehama st, install (n) factory sash, install (n) hvac unit serving area of remodelDetails
construct new owner toilet rms, 3 stop passenger elevator, new stair from 1st floor to basement. open up 4 previously blocked in windows on 1st fl facing tehama st, install (n) factory sash, install (n) hvac unit serving area of remodel | $235,000 |