Back to kitchen remodel contractors
Gallagher Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Oct 2012 to Jun 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 9 days from filing to permit and 678 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2016 | Completed final sign-off Jan 2018 | 968 Sanchez St | revision to 201505277261. revised 3rd fl and dormer layout, renovation of kitchen at 2nd fl rearrangement of interior stairsDetails
revision to 201505277261. revised 3rd fl and dormer layout, renovation of kitchen at 2nd fl rearrangement of interior stairs | $80,000 |
| Feb 22, 2016 | Completed final sign-off Apr 2019 | 818 Noe St | remodel kitchen & bathroom on 2/f refinishing of stairs, remodel powder room, upgrade electrical and mechanical, replace windows as in kind (wood marvin or eq.) no front window replacement.Details
remodel kitchen & bathroom on 2/f refinishing of stairs, remodel powder room, upgrade electrical and mechanical, replace windows as in kind (wood marvin or eq.) no front window replacement. | $65,000 |
| Jul 27, 2015 | Completed final sign-off Nov 2015 | 136 Delmar St | renovate (1) existing bathrm, new powder room, dry rot repair as necessary at rear sidewalls,(n) sliding doors at rear; new door at kitchen,replace (2) windows in kind,add (1)new window no work visible to street.Details
renovate (1) existing bathrm, new powder room, dry rot repair as necessary at rear sidewalls,(n) sliding doors at rear; new door at kitchen,replace (2) windows in kind,add (1)new window no work visible to street. | $43,000 |
| Oct 2, 2012 | Completed final sign-off Nov 2014 | 3346 Clay St | rear infill and renovation at 1st fl. kitchen renovation at 2nd fl. 3rd fl renovation to bedrooms and baths. no changes at g/f or roof. replacement of (e) outdoor deck with (n) deck with smaller footprint.Details
rear infill and renovation at 1st fl. kitchen renovation at 2nd fl. 3rd fl renovation to bedrooms and baths. no changes at g/f or roof. replacement of (e) outdoor deck with (n) deck with smaller footprint. | $195,000 |