G Legarte Construction
- Based in
- Hercules
- On San Francisco permits
- Aug 2020 to Aug 2026
- Last 24 months
- 2 permits filed
15 permits since 2000: 12 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 544 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2023 | Completed final sign-off Nov 2024 | 675 Broadway | to add wall panel at the stairway & hallway @ 2/f. no work on other floors.Details
to add wall panel at the stairway & hallway @ 2/f. no work on other floors. | $3,000 |
| Aug 14, 2020 | Completed final sign-off Sep 2023 | 1765 Oak St | dry rot repair of rear deck/stairs, less than 50% repair/replacement. wood siding replacment at rear wall, dry rot repair at front stairs less than 50%. no change to visible features. all repairs are inkindDetails
dry rot repair of rear deck/stairs, less than 50% repair/replacement. wood siding replacment at rear wall, dry rot repair at front stairs less than 50%. no change to visible features. all repairs are inkind | $15,000 |