Back to kitchen remodel contractors
G. K. Construction
- Based in
- Millbrae
- On San Francisco permits
- Oct 2011 to Feb 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 6 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2016 | Completed final sign-off Aug 2016 | 1642 Page St | kitchen remodel - replace cabinets, countertops, upgrade electrical and plumbing, new gas line for 2 fireplaces, remove soffitt: remove lath as needed, install new insulation and drywallDetails
kitchen remodel - replace cabinets, countertops, upgrade electrical and plumbing, new gas line for 2 fireplaces, remove soffitt: remove lath as needed, install new insulation and drywall | $18,000 |
| Apr 3, 2014 | Completed final sign-off May 2014 | 1226 06th Av | kitchen : remove old cabinets and instal new , bathroom: new tile and new shower head & bathtub, insall r-3 insulaton of south exterior wall.unit #5Details
kitchen : remove old cabinets and instal new , bathroom: new tile and new shower head & bathtub, insall r-3 insulaton of south exterior wall.unit #5 | $18,000 |
| Aug 22, 2013 | Never finaled issued Aug 2013, no final | 1226 06th Av | unit #4: remove existing kitchen cabinets: install new cabinets upgrade kitchen electrical outlets, (n) lighting high efficacy or controlled for cec150(k), remove old tiles in bathrm & install new tiles, remove e bath tub, shower head & install new bath tub, shower headDetails
unit #4: remove existing kitchen cabinets: install new cabinets upgrade kitchen electrical outlets, (n) lighting high efficacy or controlled for cec150(k), remove old tiles in bathrm & install new tiles, remove e bath tub, shower head & install new bath tub, shower head | $17,000 |