G&C Construction Services Inc.

Contractor license
1022951
State license record
Based in
San Mateo
On San Francisco permits
Feb 2017 to Sep 2026
Last 24 months
10 permits filed

76 permits since 2000: 64 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.

Of the 6 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 3Stairs 4Kitchen remodel 17Bathroom remodel 25

3 deck permits: 2 completed, 1 never finaled. Typically 91 days from filing to permit and 347 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 12, 2024Completed
final sign-off Jul 2024
214 Corbett Avremove (e) deck 20% of surface/ replace in kind, pour cement, repair leak @ back elevation. french drain 4" pipe below ground and surface, approx 20' linear, replace water heater for tankless as per notice of violation # 202418793, 202418837 (item # s 2&3), 202418862.
Details
Permit
202402125753
Status
complete
Filed
Feb 12, 2024
Permit issued
Feb 12, 2024
Final sign-off
Jul 19, 2024
Declared cost
$8,000
Address
214 Corbett Av

remove (e) deck 20% of surface/ replace in kind, pour cement, repair leak @ back elevation. french drain 4" pipe below ground and surface, approx 20' linear, replace water heater for tankless as per notice of violation # 202418793, 202418837 (item # s 2&3), 202418862.

Open the permit page

$8,000
Dec 14, 2022Completed
final sign-off Apr 2026
354 Douglass Stthis project involves a 44 sf addition (26 sf "fill-in" on the main fl and a 18 sf lightwell infill on the 2/f). roughly, 1100 sf interior remodel. 180 sf 30" rear deck like for like wood window replacement, widen garage door to 8'.
Details
Permit
202212148284
Status
complete
Filed
Dec 14, 2022
Permit issued
Oct 17, 2024
Final sign-off
Apr 6, 2026
Declared cost
$410,000
Address
354 Douglass St

this project involves a 44 sf addition (26 sf "fill-in" on the main fl and a 18 sf lightwell infill on the 2/f). roughly, 1100 sf interior remodel. 180 sf 30" rear deck like for like wood window replacement, widen garage door to 8'.

Open the permit page

$410,000
Jul 22, 2021Never finaled
issued Oct 2021, no final
441 Ulloa Staddition of habitable rooms at the garage level within the (e) structure. the new habitabl rooms are to include a laundry room and master suite including a master bath. addition of new deck in rear yard.
Details
Permit
202107224881
Status
issued
Filed
Jul 22, 2021
Permit issued
Oct 21, 2021
Declared cost
$55,000
Address
441 Ulloa St

addition of habitable rooms at the garage level within the (e) structure. the new habitabl rooms are to include a laundry room and master suite including a master bath. addition of new deck in rear yard.

Open the permit page

$55,000