Back to bathroom remodel contractors
G&C Construction Services Inc.
- Based in
- San Mateo
- On San Francisco permits
- Feb 2017 to Sep 2026
- Last 24 months
- 10 permits filed
76 permits since 2000: 64 completed, 5 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 21 completed, 2 in progress, 2 never finaled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Feb 2026 | 4819 Anza St | revision to pa 202511240326 alteration to (e) single family home. conversion of existing garge to living area; relocate kitchen to 1st fl; add 1 full bath first floor; reconfigure 2nd floorDetails
revision to pa 202511240326 alteration to (e) single family home. conversion of existing garge to living area; relocate kitchen to 1st fl; add 1 full bath first floor; reconfigure 2nd floor | $150,000 |
| Nov 24, 2025 | In progress issued Nov 2025 | 4819 Anza St | replace 6 windows in kind, same style at front elevation casement, anderson 400 series, remodel existing kitchen 8'x12' in kind, remodel existing bathroom 8' x 9' 1 shower pan, replace water heater w/tank less replace furnace.Details
replace 6 windows in kind, same style at front elevation casement, anderson 400 series, remodel existing kitchen 8'x12' in kind, remodel existing bathroom 8' x 9' 1 shower pan, replace water heater w/tank less replace furnace. | $110,000 |
| Jul 29, 2025 | Completed final sign-off Oct 2025 | 394 Connecticut St | remodel existing bathroom in kind with 1 shower pan. run 20amp breaker dedicated circuit. 1 exhaust fan, replace window in kind, in the same opening, tempered glass. window is street facing.Details
remodel existing bathroom in kind with 1 shower pan. run 20amp breaker dedicated circuit. 1 exhaust fan, replace window in kind, in the same opening, tempered glass. window is street facing. | $18,000 |
| Feb 25, 2025 | Completed final sign-off May 2025 | 39 Boardman Pl | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $20,000 |
| Feb 10, 2025 | Completed final sign-off Jul 2025 | 404 Waller St | kitchen and bath remodeling,like for like.unit rewiring and sub panel. no structural work. no removal of wallsDetails
kitchen and bath remodeling,like for like.unit rewiring and sub panel. no structural work. no removal of walls | $68,000 |
| Feb 10, 2025 | Completed final sign-off Jul 2025 | 406 Waller St | kitchen and bath remodeling, unit rewiring and subpanel installation. no structrual work, like for like. no removal of wallsDetails
kitchen and bath remodeling, unit rewiring and subpanel installation. no structrual work, like for like. no removal of walls | $60,000 |
| Oct 2, 2024 | Completed final sign-off Oct 2024 | 1107 Bosworth St | revision to pa # 2024-0714-6424 replace (e) broken casement window at rear & side bathroom 24" x 40", same size.Details
revision to pa # 2024-0714-6424 replace (e) broken casement window at rear & side bathroom 24" x 40", same size. | $1,000 |
| Jul 14, 2024 | Completed final sign-off Oct 2024 | 1107 Bosworth St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $16,000 |
| Apr 10, 2024 | Completed final sign-off Mar 2026 | 354 Douglass St | remodel (e) bathroom in kind replace water heater to tankless, upgrade electrical panel, replace front shingles, same in kind 600 sqDetails
remodel (e) bathroom in kind replace water heater to tankless, upgrade electrical panel, replace front shingles, same in kind 600 sq | $20,000 |
| Feb 26, 2024 | Completed final sign-off Jul 2024 | 18 Eureka St | remodel two (e) bathrooms in kind, 2 showers run dedicated electrical gfi install tankless water heater to replace (e) regular tankDetails
remodel two (e) bathrooms in kind, 2 showers run dedicated electrical gfi install tankless water heater to replace (e) regular tank | $50,000 |
| Jun 9, 2023 | Completed final sign-off Feb 2024 | 54 Vernon St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). need a "green tag" for electrical service equipment. | $50,000 |
| Jul 22, 2021 | Never finaled issued Oct 2021, no final | 441 Ulloa St | addition of habitable rooms at the garage level within the (e) structure. the new habitabl rooms are to include a laundry room and master suite including a master bath. addition of new deck in rear yard.Details
addition of habitable rooms at the garage level within the (e) structure. the new habitabl rooms are to include a laundry room and master suite including a master bath. addition of new deck in rear yard. | $55,000 |
| Jun 11, 2021 | Completed final sign-off Mar 2022 | 34 Clipper St | kitchen & 2nd fl bath remodel like for like 1st fl. bath finishes renovation, like for like replacement of (5) windows on side & back of house w/wood. general & trim.Details
kitchen & 2nd fl bath remodel like for like 1st fl. bath finishes renovation, like for like replacement of (5) windows on side & back of house w/wood. general & trim. | $105,000 |
| May 6, 2021 | Never finaled issued May 2021, no final | 1307 Mason St | remodel (e) kitchen, bathroom shower inkind. rpelace conventional water heater for tankless tpe. upgrade elecrical panel to 200a.Details
remodel (e) kitchen, bathroom shower inkind. rpelace conventional water heater for tankless tpe. upgrade elecrical panel to 200a. | $40,000 |
| Mar 30, 2021 | Completed final sign-off Dec 2021 | 855 Folsom St | remodel 2 bathrooms in kind 6x8" approximatelyDetails
remodel 2 bathrooms in kind 6x8" approximately | $39,000 |
| Jun 15, 2020 | Completed final sign-off Oct 2022 | 252 Sanchez St | unit a: remodel existing kitchen and bathroom in kind. two showers. replace existing exterior windows, front and rear, no change to sizes at front. remodel in kind, non-structural.Details
unit a: remodel existing kitchen and bathroom in kind. two showers. replace existing exterior windows, front and rear, no change to sizes at front. remodel in kind, non-structural. | $75,000 |
| Jan 15, 2020 | Completed final sign-off Apr 2020 | 4009 Mission St | replace rear windows 2 same in kind. remodel existing kitchen 130 sqft, bathroom 70 sqft, bathtub same in kind. replace window kitchen, dining room doors. replace existing skylights. all windows not facing the street.Details
replace rear windows 2 same in kind. remodel existing kitchen 130 sqft, bathroom 70 sqft, bathtub same in kind. replace window kitchen, dining room doors. replace existing skylights. all windows not facing the street. | $30,000 |
| Dec 19, 2019 | Completed final sign-off Dec 2020 | 4657 19th St | -remodel existing bathroom. add shower in kind. add pocket door. (4659) -remodel existing kitchen in kind. same layout. (4659) -add furnace, electrical sub panel 100amps - 4657 windows and furnace -replace all windows. same design. wood clad. exterior 12 total.Details
-remodel existing bathroom. add shower in kind. add pocket door. (4659) -remodel existing kitchen in kind. same layout. (4659) -add furnace, electrical sub panel 100amps - 4657 windows and furnace -replace all windows. same design. wood clad. exterior 12 total. | $60,000 |
| Nov 18, 2019 | Completed final sign-off Dec 2021 | 1446 45th Av | convert existing 1st floor car/storage area to living space with bedroom, bathroom, & family room. emclosed part of existing entry/breezeway. remodel kitchen on 2nd floor. no increase in building footprint.Details
convert existing 1st floor car/storage area to living space with bedroom, bathroom, & family room. emclosed part of existing entry/breezeway. remodel kitchen on 2nd floor. no increase in building footprint. | $85,000 |
| Aug 12, 2019 | Completed final sign-off Dec 2019 | 553 Dolores St | rmeodel (e) full bath. replace bath tub w/ shower, all plumbing fixtures, swing door w/ pocket door. bathroom remodel, in-kindDetails
rmeodel (e) full bath. replace bath tub w/ shower, all plumbing fixtures, swing door w/ pocket door. bathroom remodel, in-kind | $15,000 |
| Jun 18, 2019 | Completed final sign-off Oct 2019 | 2340 Cecilia Av | remodel (e) bathroom 10x7 half bath 4x10. replace tub w/shower. add exhaust fan, heated floor. replace 2 existing windows, side walls, casement. not facing st.Details
remodel (e) bathroom 10x7 half bath 4x10. replace tub w/shower. add exhaust fan, heated floor. replace 2 existing windows, side walls, casement. not facing st. | $15,000 |
| Oct 22, 2018 | Completed final sign-off Jan 2021 | 4109 23rd St | renovate basement to living space, shower, bathroom, bedroom, living room, laundry area; replace water heater, front windows, paint, update front railings and stepsDetails
renovate basement to living space, shower, bathroom, bedroom, living room, laundry area; replace water heater, front windows, paint, update front railings and steps | $45,000 |
| Jul 27, 2018 | Completed final sign-off Dec 2018 | 548 Laidley St | remodel existing bathroom. non moving walls. replace tub w/shower. lights 10 x 7 x 8'5Details
remodel existing bathroom. non moving walls. replace tub w/shower. lights 10 x 7 x 8'5 | $18,000 |
| Oct 27, 2017 | Completed final sign-off Jun 2018 | 1800 15th Av | update existing ktichen, non structural. remodel existing bathroom with shower. add half bath. add 100 amps, electrical panel replace existing furnaceDetails
update existing ktichen, non structural. remodel existing bathroom with shower. add half bath. add 100 amps, electrical panel replace existing furnace | $50,000 |
| May 5, 2017 | Completed final sign-off Jul 2018 | 7 Seward St | remodel 1 bathroom/shower, add bathroom with shower, remodel kitchen, new wiring/plumbing. side windows into alleway to be casement type.Details
remodel 1 bathroom/shower, add bathroom with shower, remodel kitchen, new wiring/plumbing. side windows into alleway to be casement type. | $85,000 |