Full Moon Construction
- Based in
- Novato
- On San Francisco permits
- May 2011 to Dec 2020
- Last 24 months
- 0 permits filed
12 permits since 2000: 11 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 13 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2020 | Never finaled filed Sep 2020, never issued | 15 Belgrave Av | remodel of the proposed 2-story residence, 3 bedroom, 3 bath, attached garage/basement, 239 sf addition at 1st and 2nd levels, new windows and exterior siding. new lighting, electrical, plumbing & mechanical. remodel of entry stair, 113 sf addition to garage (within existing building footprint).Details
remodel of the proposed 2-story residence, 3 bedroom, 3 bath, attached garage/basement, 239 sf addition at 1st and 2nd levels, new windows and exterior siding. new lighting, electrical, plumbing & mechanical. remodel of entry stair, 113 sf addition to garage (within existing building footprint). | $300,000 |
| Jun 17, 2016 | Completed final sign-off Aug 2016 | 850 Elizabeth St | revision to 201605026301. replace in kind, repair dry rot in existing stucco at upper landings. move post at base of stair to front of lowest stair. do not 3/4 ply to lower stair run. 1 hr fire wall at area where dryrot repairedDetails
revision to 201605026301. replace in kind, repair dry rot in existing stucco at upper landings. move post at base of stair to front of lowest stair. do not 3/4 ply to lower stair run. 1 hr fire wall at area where dryrot repaired | $1,500 |
| May 2, 2016 | Completed final sign-off Aug 2016 | 850 Elizabeth St | change stairs at exterior fronmt of homeDetails
change stairs at exterior fronmt of home | $15,000 |
| Sep 12, 2014 | Completed final sign-off Nov 2014 | 261 Henry St | repair front entry stair, replace treds, risers, ballusters, handrail, new guardrail. led stair lightingDetails
repair front entry stair, replace treds, risers, ballusters, handrail, new guardrail. led stair lighting | $7,000 |