Back to bathroom remodel contractors
Fsp General Contractors Llc
- Based in
- Greenbrae
- On San Francisco permits
- Mar 2022 to May 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2023 | Completed final sign-off Jan 2024 | 11 Crestline Dr | unit 3: kitchen: like-for-like, new countertops, cabinets, sink, electrical to code w/dedicated breakers; bath: like-for-like, new tub, tile walls, floor, sink, vanityDetails
unit 3: kitchen: like-for-like, new countertops, cabinets, sink, electrical to code w/dedicated breakers; bath: like-for-like, new tub, tile walls, floor, sink, vanity | $50,000 |
| Jun 21, 2023 | Completed final sign-off Jan 2024 | 11 Crestline Dr | will comply with nov# 201931811 (items #2 and #10): - apt#2 - kitchen: like for like (new countertops, cabinets, sink). additional outlet for dishwasher. bath: like for like (new vanity and shower tile). door not visible from street. repair in-kind.Details
will comply with nov# 201931811 (items #2 and #10): - apt#2 - kitchen: like for like (new countertops, cabinets, sink). additional outlet for dishwasher. bath: like for like (new vanity and shower tile). door not visible from street. repair in-kind. | $24,500 |
| Nov 8, 2022 | Completed final sign-off May 2023 | 357 29th Av | remodel 2 bathrooms in kind: bathroom 1. shower remodel everything same for same. bathroom 2. remodel tile around tub everything same for same.Details
remodel 2 bathrooms in kind: bathroom 1. shower remodel everything same for same. bathroom 2. remodel tile around tub everything same for same. | $19,800 |
| Mar 17, 2022 | Completed final sign-off Sep 2022 | 1451 10th Av | bathroom remodel like for like. demolition of (e) floor walls (drywall) excluding floor framing and wall studs, shower in master bath, retiling floor and walk in shower. relocating toilet to meet code. providing the following finish work: drywall, paint, shelves, cabinets, baseboards, and winscoat.Details
bathroom remodel like for like. demolition of (e) floor walls (drywall) excluding floor framing and wall studs, shower in master bath, retiling floor and walk in shower. relocating toilet to meet code. providing the following finish work: drywall, paint, shelves, cabinets, baseboards, and winscoat. | $37,000 |