Fsp General Contractors Llc
- Based in
- Greenbrae
- On San Francisco permits
- Mar 2022 to May 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2025 | Completed final sign-off Oct 2025 | 222 Naples St | guardrail install to left of driveway for insurance mandate. 42" steel post, cedar fillers.Details
guardrail install to left of driveway for insurance mandate. 42" steel post, cedar fillers. | $2,000 |
| Sep 5, 2024 | Completed final sign-off Oct 2024 | 118 Sussex St | install 5 new cabinets like for like. new butcher block countertop, sink to remain the same, roofing repair , replace roof shingles on approx 20 sf. all appliances to remain the same, no outlets, no electrical, no flooring, no tile work.Details
install 5 new cabinets like for like. new butcher block countertop, sink to remain the same, roofing repair , replace roof shingles on approx 20 sf. all appliances to remain the same, no outlets, no electrical, no flooring, no tile work. | $10,000 |
| Jun 25, 2024 | Completed final sign-off Sep 2024 | 222 Naples St | remove & replace deck boards & railing at rear. no change to deck profile (like for like). repair dry rot & shore up deck framing. repair only less than 50%Details
remove & replace deck boards & railing at rear. no change to deck profile (like for like). repair dry rot & shore up deck framing. repair only less than 50% | $10,000 |
| Oct 24, 2023 | Completed final sign-off Jan 2024 | 11 Crestline Dr | unit 3: kitchen: like-for-like, new countertops, cabinets, sink, electrical to code w/dedicated breakers; bath: like-for-like, new tub, tile walls, floor, sink, vanityDetails
unit 3: kitchen: like-for-like, new countertops, cabinets, sink, electrical to code w/dedicated breakers; bath: like-for-like, new tub, tile walls, floor, sink, vanity | $50,000 |
| Oct 2, 2023 | Completed final sign-off Mar 2024 | 1714 09th Av | bedroom remodel: like for like. replacing shower tile, vanity, toilet, drywall, lighting.Details
bedroom remodel: like for like. replacing shower tile, vanity, toilet, drywall, lighting. | $25,000 |
| Jun 21, 2023 | Completed final sign-off Jan 2024 | 11 Crestline Dr | will comply with nov# 201931811 (items #2 and #10): - apt#2 - kitchen: like for like (new countertops, cabinets, sink). additional outlet for dishwasher. bath: like for like (new vanity and shower tile). door not visible from street. repair in-kind.Details
will comply with nov# 201931811 (items #2 and #10): - apt#2 - kitchen: like for like (new countertops, cabinets, sink). additional outlet for dishwasher. bath: like for like (new vanity and shower tile). door not visible from street. repair in-kind. | $24,500 |
| Nov 8, 2022 | Completed final sign-off May 2023 | 357 29th Av | remodel 2 bathrooms in kind: bathroom 1. shower remodel everything same for same. bathroom 2. remodel tile around tub everything same for same.Details
remodel 2 bathrooms in kind: bathroom 1. shower remodel everything same for same. bathroom 2. remodel tile around tub everything same for same. | $19,800 |
| Mar 17, 2022 | Completed final sign-off Sep 2022 | 1451 10th Av | bathroom remodel like for like. demolition of (e) floor walls (drywall) excluding floor framing and wall studs, shower in master bath, retiling floor and walk in shower. relocating toilet to meet code. providing the following finish work: drywall, paint, shelves, cabinets, baseboards, and winscoat.Details
bathroom remodel like for like. demolition of (e) floor walls (drywall) excluding floor framing and wall studs, shower in master bath, retiling floor and walk in shower. relocating toilet to meet code. providing the following finish work: drywall, paint, shelves, cabinets, baseboards, and winscoat. | $37,000 |