Back to bathroom remodel contractors
Frisco Bay Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Apr 2025
- Last 24 months
- 1 permit filed
18 permits since 2000: 11 completed, 1 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 8 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2025 | In progress issued Jul 2025 | 3649 19th St | remodel existing kitchen and bathroom. add a new full bathroom. no exterior work.Details
remodel existing kitchen and bathroom. add a new full bathroom. no exterior work. | $80,000 |
| May 28, 2024 | Expired or cancelled cancelled Jan 2026 | 2 Perine Pl | remodel bathroom same layout, remove and replace tile, new toilet, sink and shower valve, paint complete bathroom, new showe doorDetails
remodel bathroom same layout, remove and replace tile, new toilet, sink and shower valve, paint complete bathroom, new showe door | $14,000 |
| Jul 7, 2021 | Completed final sign-off Oct 2021 | 1385 Hampshire St | 1385a hampshire st: frame box for new bathroom fan/repair sheetrock damage and paint, repair celing. no structural changes. kitchen remodel using (e) cabinets, replace wiring. install washer/dryer under kitchen area. no new fixtures.Details
1385a hampshire st: frame box for new bathroom fan/repair sheetrock damage and paint, repair celing. no structural changes. kitchen remodel using (e) cabinets, replace wiring. install washer/dryer under kitchen area. no new fixtures. | $3,000 |
| Apr 8, 2021 | Completed final sign-off Oct 2021 | 1387 Hampshire St | remodeling bathroom, replace sub panel close (e) door with new wall, increse size of door openingDetails
remodeling bathroom, replace sub panel close (e) door with new wall, increse size of door opening | $10,000 |
| Sep 2, 2020 | Completed final sign-off Apr 2021 | 44 Lunado Wy | remodel of kitchen like to like, new 7 ckts update plumbing, new bathroom, one circuit and plumbing.Details
remodel of kitchen like to like, new 7 ckts update plumbing, new bathroom, one circuit and plumbing. | $30,000 |
| Dec 6, 2019 | Completed final sign-off Oct 2020 | 1550 Vallejo St | unit 1: remodel kitchen and bathroom. replace kitchen cabinets in kind. add 1 extra gfi, sink and faucet. new shower pan.Details
unit 1: remodel kitchen and bathroom. replace kitchen cabinets in kind. add 1 extra gfi, sink and faucet. new shower pan. | $8,000 |
| Aug 7, 2019 | Completed final sign-off Feb 2020 | 906 Stanyan St | revise bap# 2019-0705-5222. revise bathroom layouts.Details
revise bap# 2019-0705-5222. revise bathroom layouts. | |
| Jul 5, 2019 | Completed final sign-off Feb 2020 | 906 Stanyan St | for units 906/908/910 stanyan st: kitchen, bathroom, livingroom, bedroom remodel. new partitions and new fixtures and hardware throughout.Details
for units 906/908/910 stanyan st: kitchen, bathroom, livingroom, bedroom remodel. new partitions and new fixtures and hardware throughout. | $150,000 |
| Apr 22, 2019 | Completed final sign-off Aug 2019 | 2933 24th St | remodel 2 bathrooms, kitchen, install new subpanel & lights & outlets.Details
remodel 2 bathrooms, kitchen, install new subpanel & lights & outlets. | $48,000 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 2937 24th St | remodel bathroom and kitchen in kind, replace 7 windows - new subpanel outlets and switches for kitchen. double hung wood materials. project is on 2nd floor. all work in residential dwelling.Details
remodel bathroom and kitchen in kind, replace 7 windows - new subpanel outlets and switches for kitchen. double hung wood materials. project is on 2nd floor. all work in residential dwelling. | $22,000 |
| Jun 1, 2018 | Never finaled issued Jun 2018, no final | 205 Castenada Av | remodel (e) master bathroom, (e) full bathroom, (e) kitchen, construct (n) 1/2 bathroom. remove non-bearing wall between kitchen & dining room at 2nd fl. remodel (e) bathroom & ground fl. voluntary lateral improvement at ground fl.Details
remodel (e) master bathroom, (e) full bathroom, (e) kitchen, construct (n) 1/2 bathroom. remove non-bearing wall between kitchen & dining room at 2nd fl. remodel (e) bathroom & ground fl. voluntary lateral improvement at ground fl. | $50,000 |
| Sep 21, 2016 | Completed final sign-off May 2017 | 2866 Pine St | remodel garage area to create new mudroom, playroom, bath and laundry at 1st level.Details
remodel garage area to create new mudroom, playroom, bath and laundry at 1st level. | $20,000 |