Back to kitchen remodel contractors
Friendly Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Mar 2017
- Last 24 months
- 0 permits filed
24 permits since 2000: 21 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 never finaled. Typically 0 days from filing to permit and 83 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2017 | Completed final sign-off Jul 2017 | 1183 Dolores St | kitchen refurbished, replace faucet, cabinets and sink. replace countertop and island. repalce tile backplashed. replace appliances as a hood, a cook top, dishwasher and diisposal.Details
kitchen refurbished, replace faucet, cabinets and sink. replace countertop and island. repalce tile backplashed. replace appliances as a hood, a cook top, dishwasher and diisposal. | $15,000 |
| Aug 6, 2013 | Completed final sign-off Oct 2013 | 542 23rd Av | replace fixtures in 2nd floor. kitchen - no structural work and 3rd floor bath.Details
replace fixtures in 2nd floor. kitchen - no structural work and 3rd floor bath. | $10,000 |
| Sep 19, 2008 | Completed final sign-off Nov 2008 | 1576 36th Av | kitchen remodel. no structural change. replace cabinets, coutertop, hood & stove & rifrigerator, sink, the floor will be remained. install siz light fixtures.Details
kitchen remodel. no structural change. replace cabinets, coutertop, hood & stove & rifrigerator, sink, the floor will be remained. install siz light fixtures. | $8,450 |
| Aug 17, 2007 | Completed final sign-off Oct 2007 | 1706 28th Av | kitchen remodel - no structural changes. existing lighting fixtures to remain.Details
kitchen remodel - no structural changes. existing lighting fixtures to remain. | $12,000 |
| Jun 12, 2007 | Completed final sign-off Oct 2007 | 1217 04th Av | remodel kitchen , cabinet replacement, appliance replacement. replace bathroom fixture, tub, vanityDetails
remodel kitchen , cabinet replacement, appliance replacement. replace bathroom fixture, tub, vanity | $25,000 |
| Jan 26, 2007 | Completed final sign-off Apr 2007 | 1962 29th Av | change kitchen cupboards + counters + sink & replace range hood.Details
change kitchen cupboards + counters + sink & replace range hood. | $20,000 |
| Mar 27, 2006 | Completed final sign-off Jul 2006 | 2235 40th Av | remodel bathroom at upper level, relocate kitchen at upper level, construct two bedrooms & full bathroom at garage levelDetails
remodel bathroom at upper level, relocate kitchen at upper level, construct two bedrooms & full bathroom at garage level | $40,000 |
| Oct 4, 2005 | Completed final sign-off Dec 2005 | 1971 29th Av | remodel kitchen (counter & wall) & bathroom.Details
remodel kitchen (counter & wall) & bathroom. | $14,000 |
| Jan 12, 2005 | Never finaled issued Jan 2005, no final | 1219 04th Av | remodel kitchen & remove non load bearing wall at kitchen & dining rm, install new window in (e)Details
remodel kitchen & remove non load bearing wall at kitchen & dining rm, install new window in (e) | $10,000 |
| Mar 10, 2004 | Completed final sign-off Jun 2004 | 25 Judah St | remodel 1 kitchen & 1 bath,no change into wall location,change bathroom door to pocket doorDetails
remodel 1 kitchen & 1 bath,no change into wall location,change bathroom door to pocket door | $12,000 |