Back to kitchen remodel contractors
Frank O'rourke Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2020 to Sep 2023
- Last 24 months
- 0 permits filed
10 permits since 2000: 4 completed, 6 never finaled.
Of the 6 never-finaled permits, 4 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 69 Beaumont Av | hardi siding installation on south wall/top portion to repair water damage. kitchen counter replacement and appliance update. bathroom vanity replacement/retiling, replace bathtub w/ new tub, replace bathtub w/ shower (same footprint). replace carpet and linoleum with lvt (tbd). no removal of wallsDetails
hardi siding installation on south wall/top portion to repair water damage. kitchen counter replacement and appliance update. bathroom vanity replacement/retiling, replace bathtub w/ new tub, replace bathtub w/ shower (same footprint). replace carpet and linoleum with lvt (tbd). no removal of walls | $55,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 2009 Divisadero St | kitchen remodel: remove existing kitchen and install new kitchen. upgrade lighting in ceiling. bathroom remodel: cosmetic changes i.e. new tile vanity, bathtub, toilet. all remodel in kind. unit 3b.Details
kitchen remodel: remove existing kitchen and install new kitchen. upgrade lighting in ceiling. bathroom remodel: cosmetic changes i.e. new tile vanity, bathtub, toilet. all remodel in kind. unit 3b. | $60,000 |
| Sep 7, 2021 | Completed final sign-off Dec 2021 | 14 Farview Ct | remodel extg kitchen. remodel extg bathroom, cosmetic. add new electrical in living room, ceiling, kitchen ceiling/wall. a new electrical subpanel and gas tankless water heater 80% ef min. lights per cenc 150.0 (k)Details
remodel extg kitchen. remodel extg bathroom, cosmetic. add new electrical in living room, ceiling, kitchen ceiling/wall. a new electrical subpanel and gas tankless water heater 80% ef min. lights per cenc 150.0 (k) | $50,000 |