Frank Lau Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Nov 2002 to Aug 2019
- Last 24 months
- 0 permits filed
123 permits since 2000: 91 completed, 12 never finaled, 20 expired or cancelled.
Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 0 days from filing to permit and 42 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2017 | Completed final sign-off Feb 2021 | 610 Russia Av | relocate deck stairs. repair dry rot as needed.Details
relocate deck stairs. repair dry rot as needed. | $7,500 |
| Jul 26, 2010 | Completed final sign-off Aug 2010 | 806 Shields St | repair front two steps and landing by removal of existing concrete steps and replace in-kind. remove & replace front stucco around window & repair leaks. repair dry rot at backyard decking with pressure treated material less than 50% in-kind.Details
repair front two steps and landing by removal of existing concrete steps and replace in-kind. remove & replace front stucco around window & repair leaks. repair dry rot at backyard decking with pressure treated material less than 50% in-kind. | $5,000 |
| Oct 13, 2006 | Completed final sign-off Oct 2006 | 1280 04th Av | replace redwood decking total work less than 50% of the extg deckDetails
replace redwood decking total work less than 50% of the extg deck | $1,800 |
| Sep 8, 2005 | Completed final sign-off Nov 2005 | 1335 24th Av | replace metal feshing on all wndw/replace one bthrm and tile/repair deck flooring at extg deck inDetails
replace metal feshing on all wndw/replace one bthrm and tile/repair deck flooring at extg deck in | $6,500 |