Fox Structural & Termite
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Nov 2017
- Last 24 months
- 0 permits filed
287 permits since 2000: 257 completed, 10 never finaled, 20 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 7 completed. Typically 0 days from filing to permit and 33 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2015 | Completed final sign-off Apr 2015 | 659 Broderick St | all section i item on fox structural & termite report #15332 dated 2/13/15, repair no more than 50% on stair, door not visable from the street.Details
all section i item on fox structural & termite report #15332 dated 2/13/15, repair no more than 50% on stair, door not visable from the street. | $36,000 |
| Feb 2, 2012 | Completed final sign-off Feb 2012 | 2447 15th Av | all section i item on fox structure & termite report #13787 dated 1/31/12, install new anchor bolts 5/8 x 10" in garage @ 4'oc, install host/beam connection in garage. less than 50% repair on front stairs.Details
all section i item on fox structure & termite report #13787 dated 1/31/12, install new anchor bolts 5/8 x 10" in garage @ 4'oc, install host/beam connection in garage. less than 50% repair on front stairs. | $19,000 |
| Jun 21, 2007 | Completed final sign-off Jul 2007 | 336 Missouri St | in-kind repair of less than 50% of rear deck and stairs, per termite report #12207Details
in-kind repair of less than 50% of rear deck and stairs, per termite report #12207 | $6,000 |
| Mar 23, 2005 | Completed final sign-off Apr 2005 | 350 Claremont Bl | section 1 item on fox str termite report no. 11395 dated 3/9/05 (less than 50 percent of stairs)Details
section 1 item on fox str termite report no. 11395 dated 3/9/05 (less than 50 percent of stairs) | $7,000 |
| Apr 21, 2004 | Completed final sign-off Jun 2004 | 261 Harvard St | item 1b, 3a,5b , on fox report#10894 dated 01/16/04. repair stucco + replace front stair in kind.Details
item 1b, 3a,5b , on fox report#10894 dated 01/16/04. repair stucco + replace front stair in kind. | $12,000 |
| Jan 28, 2003 | Completed final sign-off Feb 2003 | 576 29th St | remove stucco and repair underlying damage at left bannester of front stairs/restuccoDetails
remove stucco and repair underlying damage at left bannester of front stairs/restucco | $3,000 |
| Dec 17, 2001 | Completed final sign-off Aug 2002 | 1975 Mcallister St | repair front stairs as termite report #10273 dtd 12/14/01 repair work will be less than 50%Details
repair front stairs as termite report #10273 dtd 12/14/01 repair work will be less than 50% | $10,000 |