Back to kitchen remodel contractors
Fort Ross Siding Inc.
- Based in
- Granite Bay
- On San Francisco permits
- Oct 2013 to Jan 2026
- Last 24 months
- 5 permits filed
34 permits since 2000: 30 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 525 34th Av | replace entry door and (5) windows in front of the house. replace (2) windows in dining room and (1) window in living room and sliding door in kitchen. total (8) windows to be replaced with (1) entry door and (1) sliding door(change to french door, double). (5) windws street visibleDetails
replace entry door and (5) windows in front of the house. replace (2) windows in dining room and (1) window in living room and sliding door in kitchen. total (8) windows to be replaced with (1) entry door and (1) sliding door(change to french door, double). (5) windws street visible | $21,358 |