Back to kitchen remodel contractors
Fornari Inc Dba Bold Construction
- Based in
- Oakland
- On San Francisco permits
- Jan 2025 to Aug 2026
- Last 24 months
- 20 permits filed
20 permits since 2000: 14 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 7 completed, 4 in progress. Typically 0 days from filing to permit and 68 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Sep 2026 | 255 Hearst Av | renovation of a portion of the (e) 1st floor,converting it from unconditioned to conditioned space.a new interior stair is proposed to provide access between the upper & lower levels. the (e) 2nd floor kitchen will be removed, a new kitvhen will be installed on the 1st flr. 2nd flr bathroom will beDetails
renovation of a portion of the (e) 1st floor,converting it from unconditioned to conditioned space.a new interior stair is proposed to provide access between the upper & lower levels. the (e) 2nd floor kitchen will be removed, a new kitvhen will be installed on the 1st flr. 2nd flr bathroom will be | $100,000 |
| May 5, 2026 | In progress issued May 2026 | 2035 Lyon St | remove wall between kitchen and dining room. widen garage door, angle driveway planterDetails
remove wall between kitchen and dining room. widen garage door, angle driveway planter | $12,500 |
| Apr 10, 2026 | In progress issued Apr 2026 | 1970 Jackson St | revise p/a 2025-0915-5307 to include the scope of work associated with the relocation of an (e) half bathroom on 2nd floor from entry area to kitchen area. non-structural, no change in plumbing fixture count.Details
revise p/a 2025-0915-5307 to include the scope of work associated with the relocation of an (e) half bathroom on 2nd floor from entry area to kitchen area. non-structural, no change in plumbing fixture count. | $5,000 |
| Mar 24, 2026 | Completed final sign-off Oct 2026 | 2264 Beach St | 1st fl: modify floor plan, relocate bathroom, replace window with french foor, (n) fire rated 1 hr wall. 2nd fl: enlarge kitchen opening. 3rd fl: bathroom addition with shower, (n) closets. knob and tube wiring replacement.Details
1st fl: modify floor plan, relocate bathroom, replace window with french foor, (n) fire rated 1 hr wall. 2nd fl: enlarge kitchen opening. 3rd fl: bathroom addition with shower, (n) closets. knob and tube wiring replacement. | $25,800 |
| Mar 1, 2026 | Completed final sign-off Sep 2026 | 2264 Beach St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 0 shower pan(s). | $18,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 3234 Clay St | in-kind remodeling of 1 kitchen(s) in 3rd flDetails
in-kind remodeling of 1 kitchen(s) in 3rd fl | $5,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 3234 Clay St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $5,000 |
| Sep 15, 2025 | In progress issued Oct 2025 | 1970 Jackson St | 1) build new bathroomon on 1st floor. 2) remodel existing kitchen. 3)build new partition wall on 4th floor.Details
1) build new bathroomon on 1st floor. 2) remodel existing kitchen. 3)build new partition wall on 4th floor. | $40,000 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 2245 Union St | change of use from an 2 unit commercial use to sfd use. minor kitchen remodel to install a new domestic range & exhaust hood, install new bathroom exhaust fans & combination smoke / carbon monoxide detectos where required. no exterior work proposed.Details
change of use from an 2 unit commercial use to sfd use. minor kitchen remodel to install a new domestic range & exhaust hood, install new bathroom exhaust fans & combination smoke / carbon monoxide detectos where required. no exterior work proposed. | $1,000 |
| Mar 18, 2025 | Completed final sign-off Apr 2025 | 3234 Lyon St | kitchen remodel no wall removal or layout changes.countertops sink and backsplash onlyDetails
kitchen remodel no wall removal or layout changes.countertops sink and backsplash only | $1,000 |
| Jan 7, 2025 | Completed final sign-off Jul 2025 | 1517 06th Av | in-kind kitchen remodel - new cabinets. no moving wallsDetails
in-kind kitchen remodel - new cabinets. no moving walls | $3,000 |