Forma Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Sep 2026
- Last 24 months
- 37 permits filed
176 permits since 2000: 113 completed, 23 in progress, 27 never finaled, 13 expired or cancelled.
Of the 27 never-finaled permits, 13 are 3 to 5 years old, 4 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
10 deck permits: 7 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 102 days from filing to permit and 404 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2026 | In progress issued Feb 2026 | 119 26th Av | repl (e) windows, add(n) prop line fire windows at n elev. repl (e) cedar shingles w/(n), repl and expand(e) deck/patio, expand m. bath, creat(n) bath, reloc laundry, raise m. bedroom clg. remodel kitch, add laundry & mod room off garage, repl(e) lower floor1/2bath...ref/rev to 202509105017.Details
repl (e) windows, add(n) prop line fire windows at n elev. repl (e) cedar shingles w/(n), repl and expand(e) deck/patio, expand m. bath, creat(n) bath, reloc laundry, raise m. bedroom clg. remodel kitch, add laundry & mod room off garage, repl(e) lower floor1/2bath...ref/rev to 202509105017. | $275,000 |
| Feb 13, 2024 | Completed final sign-off Sep 2024 | 626 Polk St | replace awning over existing deck with metal canopy. total covered area is same as existing.Details
replace awning over existing deck with metal canopy. total covered area is same as existing. | $1,000 |
| Sep 19, 2016 | Completed final sign-off Nov 2020 | 1650 North Point St | reconfiguration and horizontal expansion of (e) ground floor. reconfiguration of (e) second floor and addition of second floor deck. vertical addition of new 3rd floor living area, deck, roof deck. n/a for maher ordinance no-155.13Details
reconfiguration and horizontal expansion of (e) ground floor. reconfiguration of (e) second floor and addition of second floor deck. vertical addition of new 3rd floor living area, deck, roof deck. n/a for maher ordinance no-155.13 | $610,000 |
| Jun 8, 2016 | Completed final sign-off Aug 2016 | 841 Church St | rear deck repair, less than 50%, in kind.Details
rear deck repair, less than 50%, in kind. | $5,000 |
| Jul 10, 2013 | Completed final sign-off Dec 2015 | 2833 Union St | widen & relocate garage door, reconfigure front stairs. add (n) 4th fl penthouse & decks. remodel (e) bedrooms, bathrooms & kitchens. upgrade all electrical, mechanical & plumbling systems.Details
widen & relocate garage door, reconfigure front stairs. add (n) 4th fl penthouse & decks. remodel (e) bedrooms, bathrooms & kitchens. upgrade all electrical, mechanical & plumbling systems. | $500,000 |
| Sep 11, 2012 | Never finaled issued Jan 2013, no final | 450 Ortega St | removal of (e), non-permitted deck. renovate of kitchen & living - construction of (n) deck at 2nd floor.Details
removal of (e), non-permitted deck. renovate of kitchen & living - construction of (n) deck at 2nd floor. | $32,000 |
| Apr 30, 2012 | Completed final sign-off Apr 2013 | 1688 Dolores St | revision to pa #201109013704; new work include new guardrail and handrail at interior stair, new skylight at dining & kitchen, slight modification to rear patio, deck and stairs, a few windows replacement.Details
revision to pa #201109013704; new work include new guardrail and handrail at interior stair, new skylight at dining & kitchen, slight modification to rear patio, deck and stairs, a few windows replacement. | $10,000 |
| Jan 19, 2012 | Completed final sign-off May 2013 | 826 Capp St | renovattion of 1st floor garage + area behind garage, foundation upgrade, addition of 200 sq ft below existing deck - renovation of 2nd floor ktichen, addition of interior stair to lower level, renovation of 3rd floor master bath.Details
renovattion of 1st floor garage + area behind garage, foundation upgrade, addition of 200 sq ft below existing deck - renovation of 2nd floor ktichen, addition of interior stair to lower level, renovation of 3rd floor master bath. | $160,000 |
| Dec 6, 2011 | Expired or cancelled expired Nov 2015 | 2727 Pacific Av | change of 2 units residence to a single residence. remove (e) exterior stair. replace with new stair. remove exist front windows. replace with terrace doors. add front terrace. add rear deck on (e) roof over bay projection.Details
change of 2 units residence to a single residence. remove (e) exterior stair. replace with new stair. remove exist front windows. replace with terrace doors. add front terrace. add rear deck on (e) roof over bay projection. | $37,000 |
| Sep 1, 2011 | Completed final sign-off May 2013 | 1688 Dolores St | renovation of space adjacent to garage at 1st floor. renovation of 2nd floor bathroom, kitchen & additional bathroom. no work to front exterior facade. additional space built out under (e) deckDetails
renovation of space adjacent to garage at 1st floor. renovation of 2nd floor bathroom, kitchen & additional bathroom. no work to front exterior facade. additional space built out under (e) deck | $100,000 |