Block 3606, lot 083
296 Liberty St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 4
- Units
- 4
- Rooms
- 10 bedrooms, 5 bathrooms
- Building
- 4,875 sq ft
- Lot
- 3,410 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2021 | Completed final sign-off Sep 2021 | 296 Liberty St | Leon Brother Roofing Inc | reroofingDetails
reroofing | $34,900 |
| May 19, 2021 | Completed final sign-off Jun 2021 | 296 Liberty St | Forma Construction | to finalize work already completed on permit numbers: 201307313215 and 201310250300.Details
to finalize work already completed on permit numbers: 201307313215 and 201310250300. | |
| Jun 8, 2016 | Completed final sign-off Aug 2016 | 841 Church St | Forma Construction | rear deck repair, less than 50%, in kind.Details
rear deck repair, less than 50%, in kind. | $5,000 |
| Oct 25, 2013 | Never finaled issued May 2014, no final | 296 Liberty St | Forma Construction | dormer addition subject to 311 notification.Details
dormer addition subject to 311 notification. | $10,000 |
| Sep 10, 2013 | Never finaled issued Sep 2013, no final | 296 Liberty St | street spaceDetails
street space | ||
| Jul 31, 2013 | Never finaled issued Oct 2013, no final | 296 Liberty St | Forma Construction | 4th floor:renovation to interior space location on top two levels.renovation is within one dwelling unitl. new windows, doors,skylights, bathrooms, bedrooms and floor opening around extg stairs.majority of work is on 4th floor.Details
4th floor:renovation to interior space location on top two levels.renovation is within one dwelling unitl. new windows, doors,skylights, bathrooms, bedrooms and floor opening around extg stairs.majority of work is on 4th floor. | $75,000 |
| May 28, 2013 | Completed final sign-off Apr 2014 | 296 Liberty St | Forma Construction | 3rd floor:interior remodel of existing kitchen within residence on 3rd floor within a four unit building. remove wall between kitchen and linving room. new wood windows and doors at existing locations.Details
3rd floor:interior remodel of existing kitchen within residence on 3rd floor within a four unit building. remove wall between kitchen and linving room. new wood windows and doors at existing locations. | $60,000 |
| May 3, 2011 | Expired or cancelled cancelled Jan 2026 | 841 Church St | revision to pa# 2011.03.02.1209. add a minor encroachment ( railing) in front of garageDetails
revision to pa# 2011.03.02.1209. add a minor encroachment ( railing) in front of garage | $500 | |
| Apr 25, 2011 | Never finaled issued Apr 2011, no final | 841 Church St | S F Garage Company Inc. | replace (e) retaining wall in kindDetails
replace (e) retaining wall in kind | $12,000 |
| Mar 21, 2011 | Never finaled issued Apr 2011, no final | 845 Church St | Thomas Building Group | repair/replace damaged window frames, glazing, int remodel, wall board, ceiling, finishes and doors. expand (e) bathroom on upper level above lower/street level. new cased opening at kitchen and lv rm. no struc work req'd or proposed except for int. door header;mechanical & plumbing under sep permiDetails
repair/replace damaged window frames, glazing, int remodel, wall board, ceiling, finishes and doors. expand (e) bathroom on upper level above lower/street level. new cased opening at kitchen and lv rm. no struc work req'd or proposed except for int. door header;mechanical & plumbing under sep permi | $58,000 |
| Mar 4, 2011 | Never finaled issued Mar 2011, no final | 845 Church St | Thomas Building Group | #845- repair fire damage. replace all wall surface, new electrical, 9 new windows. bathroom and kitchen fixtures & cabinets paint. windows facing street. all sheetrock to be replaced shall be 5/8" type x gypsum board nailed with gd coated nails 1-2/8"long 1/4"heads @7"o.c.at all edges at each faceDetails
#845- repair fire damage. replace all wall surface, new electrical, 9 new windows. bathroom and kitchen fixtures & cabinets paint. windows facing street. all sheetrock to be replaced shall be 5/8" type x gypsum board nailed with gd coated nails 1-2/8"long 1/4"heads @7"o.c.at all edges at each face | $50,000 |
| Mar 2, 2011 | Never finaled issued Apr 2011, no final | 841 Church St | S F Garage Company Inc. | convert e storage to 2 car parking garage with curb cut. sprinkler new garage under sep. permitDetails
convert e storage to 2 car parking garage with curb cut. sprinkler new garage under sep. permit | $20,000 |
| Dec 9, 2009 | Never finaled issued Dec 2009, no final | 296 Liberty St | street space onlyDetails
street space only | ||
| Apr 22, 2003 | Never finaled issued Apr 2003, no final | 296 Liberty St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Jan 30, 2001 | Completed final sign-off Feb 2001 | 296 Liberty St | reroofingDetails
reroofing | $16,000 | |
| Oct 23, 2000 | Completed final sign-off Aug 2001 | 296 Liberty St | reroofingDetails
reroofing | $18,850 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.