Fontana Construction, Inc.
- Based in
- San Rafael
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 13 permits filed
147 permits since 2000: 101 completed, 8 in progress, 23 never finaled, 15 expired or cancelled.
Of the 23 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
13 deck permits: 10 completed, 2 never finaled, 1 expired or cancelled. Typically 24 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2023 | Completed final sign-off May 2024 | 25 Presidio Tr | revision to 201607011410 & 202203180362. add roof deck on 2nd fl on family room. replace front entry stairs and add pergola on 1sf fl deck previously approved.Details
revision to 201607011410 & 202203180362. add roof deck on 2nd fl on family room. replace front entry stairs and add pergola on 1sf fl deck previously approved. | $67,381 |
| Mar 18, 2022 | Completed final sign-off May 2024 | 25 Presidio Tr | rev pa201607011410 change of deck from a wood deck to a roof deck. ext of hallway to exercise rm. french doors to deck changed to wndws. stair to be rebuilt to be open underneath. 2nd flr office will become mast bath. bath 3 will be remodeled. former master bath & closet will become master closet.Details
rev pa201607011410 change of deck from a wood deck to a roof deck. ext of hallway to exercise rm. french doors to deck changed to wndws. stair to be rebuilt to be open underneath. 2nd flr office will become mast bath. bath 3 will be remodeled. former master bath & closet will become master closet. | $40,000 |
| Jul 1, 2016 | Completed final sign-off May 2024 | 25 Presidio Tr | horizontal addition in rear yd 8'6". 2 story plus rebuild deck (less than 10' above grade) w/stair to grade, remodel kitchen, open up adj rooms, add bath on lower level in walk-in closet, change closet door on upper level.Details
horizontal addition in rear yd 8'6". 2 story plus rebuild deck (less than 10' above grade) w/stair to grade, remodel kitchen, open up adj rooms, add bath on lower level in walk-in closet, change closet door on upper level. | $125,000 |
| Sep 15, 2015 | Never finaled issued Sep 2015, no final | 910 Clayton St | (n) open guardrail & decking @ 1/f roof, (n) property line window @ kitchen; replace (e) window @ bedroom w/(n) door, remove exterior stair @ bedroom. ref. to pa# 201411212193 & 201410280097Details
(n) open guardrail & decking @ 1/f roof, (n) property line window @ kitchen; replace (e) window @ bedroom w/(n) door, remove exterior stair @ bedroom. ref. to pa# 201411212193 & 201410280097 | $1,000 |
| Mar 27, 2015 | Completed final sign-off Nov 2016 | 910 Clayton St | revision to pa 2014 1121 2193. new concrete footing to be used for deck and planter - to be used to support future additionDetails
revision to pa 2014 1121 2193. new concrete footing to be used for deck and planter - to be used to support future addition | $3,000 |
| Aug 26, 2014 | Never finaled issued Sep 2014, no final | 2520 Union St | remove & replace existing dry rotted entry deck & existing brick paving on grade, replaced deck is reinforce concrete with limestone tile pavers, repl deck will have a voluntary, decorative railing, new grade at deck is less than 30" below deck, new limestone tile pavers at (e) grade & new flagpole.Details
remove & replace existing dry rotted entry deck & existing brick paving on grade, replaced deck is reinforce concrete with limestone tile pavers, repl deck will have a voluntary, decorative railing, new grade at deck is less than 30" below deck, new limestone tile pavers at (e) grade & new flagpole. | $300,000 |
| Jun 12, 2014 | Completed final sign-off Jan 2015 | 70 Buena Vista Tr | revision to app#2013-12-04-3293. build up scope on extg 3rd floor exterior deck and reroof and install wood deck boards. replace 2 fireplace with gas and reinstall mantels.(see a3 from orig permit 2013-12-04-3293).Details
revision to app#2013-12-04-3293. build up scope on extg 3rd floor exterior deck and reroof and install wood deck boards. replace 2 fireplace with gas and reinstall mantels.(see a3 from orig permit 2013-12-04-3293). | $15,000 |
| Feb 26, 2013 | Completed final sign-off Dec 2014 | 1149 Clayton St | rear yard under (e) enclosed 2nd fl living space. remove (e) exterior stair, deck & wood posts. add (n) enclosed stair & hallway. add (n) property line walls under (e) eclosed space. add (n) wood post. add (n) bath at 1st flDetails
rear yard under (e) enclosed 2nd fl living space. remove (e) exterior stair, deck & wood posts. add (n) enclosed stair & hallway. add (n) property line walls under (e) eclosed space. add (n) wood post. add (n) bath at 1st fl | $147,000 |
| Jul 12, 2010 | Expired or cancelled expired Jul 2015 | 1770 Scott St | revision to pa# 2009.06.01.9463. ne wlocation for deck egress ( relocation of existing stair). no work visible from street. revised decl plan east end. eliminated 3 previously proposed openings in card room 216. (revision to pa #2007-0810-9377 s1 & 2009-0601-9463)Details
revision to pa# 2009.06.01.9463. ne wlocation for deck egress ( relocation of existing stair). no work visible from street. revised decl plan east end. eliminated 3 previously proposed openings in card room 216. (revision to pa #2007-0810-9377 s1 & 2009-0601-9463) | |
| May 15, 2002 | Completed final sign-off Jun 2002 | 1308 Montgomery St | repair rotted deck posts in kind w/ treated or redwood will be painted to match existing.Details
repair rotted deck posts in kind w/ treated or redwood will be painted to match existing. | $3,500 |
| Jun 15, 2001 | Completed final sign-off Jan 2003 | 2856 Union St | bedroom/bath addition in basement with expansion deck.Details
bedroom/bath addition in basement with expansion deck. | $35,000 |
| Apr 3, 2001 | Completed final sign-off Nov 2001 | 3750 Divisadero St | cover deck surfaces with ipe decking revsn 200009302013 change n deck surface rear build 4/4 nom thcDetails
cover deck surfaces with ipe decking revsn 200009302013 change n deck surface rear build 4/4 nom thc | |
| Nov 30, 2000 | Completed final sign-off Mar 2002 | 126 Divisadero St | kitchen remodel & window replacement, deck repair & alternation lower level remodel.Details
kitchen remodel & window replacement, deck repair & alternation lower level remodel. | $360,000 |