Permit GraphShortlistSan Francisco building permits since 2000

Block 1355, lot 026

25 Presidio Ter

City’s use
Single Family Residential
Built
1909
Stories
2
Units
1
Rooms
4 bathrooms
Building
3,848 sq ft
Lot
10,380 sq ft
Zoning
RH1D
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

5 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 17, 2023Completed
final sign-off May 2024
25 Presidio TrFontana Construction, Inc.revision to 201607011410 & 202203180362. add roof deck on 2nd fl on family room. replace front entry stairs and add pergola on 1sf fl deck previously approved.
Details
Permit
202308174662
Status
complete
Filed
Aug 17, 2023
Permit issued
Jan 22, 2024
Final sign-off
May 9, 2024
Declared cost
$67,381
Address
25 Presidio Tr

revision to 201607011410 & 202203180362. add roof deck on 2nd fl on family room. replace front entry stairs and add pergola on 1sf fl deck previously approved.

Open the permit page

$67,381
Nov 28, 2022Completed
final sign-off May 2024
25 Presidio TrFontana Construction, Inc.remove brick, add waterproofing, replace sides with stucco. front brick to be reinstalled. revision of pa# 2016-0701-1410
Details
Permit
202211287215
Status
complete
Filed
Nov 28, 2022
Permit issued
Dec 16, 2022
Final sign-off
May 9, 2024
Declared cost
$5,000
Address
25 Presidio Tr

remove brick, add waterproofing, replace sides with stucco. front brick to be reinstalled. revision of pa# 2016-0701-1410

Open the permit page

$5,000
Sep 12, 2022Completed
final sign-off May 2024
25 Presidio TrFontana Construction, Inc.rev to pa# 2022-0318-0362; construction of a ceiling pop-up in master bath
Details
Permit
202209122252
Status
complete
Filed
Sep 12, 2022
Permit issued
Sep 12, 2022
Final sign-off
May 8, 2024
Declared cost
$5,000
Address
25 Presidio Tr

rev to pa# 2022-0318-0362; construction of a ceiling pop-up in master bath

Open the permit page

$5,000
Mar 18, 2022Completed
final sign-off May 2024
25 Presidio TrFontana Construction, Inc.rev pa201607011410 change of deck from a wood deck to a roof deck. ext of hallway to exercise rm. french doors to deck changed to wndws. stair to be rebuilt to be open underneath. 2nd flr office will become mast bath. bath 3 will be remodeled. former master bath & closet will become master closet.
Details
Permit
202203180362
Status
complete
Filed
Mar 18, 2022
Permit issued
May 24, 2022
Final sign-off
May 8, 2024
Declared cost
$40,000
Address
25 Presidio Tr

rev pa201607011410 change of deck from a wood deck to a roof deck. ext of hallway to exercise rm. french doors to deck changed to wndws. stair to be rebuilt to be open underneath. 2nd flr office will become mast bath. bath 3 will be remodeled. former master bath & closet will become master closet.

Open the permit page

$40,000
Jul 1, 2016Completed
final sign-off May 2024
25 Presidio TrFontana Construction, Inc.horizontal addition in rear yd 8'6". 2 story plus rebuild deck (less than 10' above grade) w/stair to grade, remodel kitchen, open up adj rooms, add bath on lower level in walk-in closet, change closet door on upper level.
Details
Permit
201607011410
Status
complete
Filed
Jul 1, 2016
Permit issued
Dec 8, 2021
Final sign-off
May 8, 2024
Declared cost
$125,000
Address
25 Presidio Tr

horizontal addition in rear yd 8'6". 2 story plus rebuild deck (less than 10' above grade) w/stair to grade, remodel kitchen, open up adj rooms, add bath on lower level in walk-in closet, change closet door on upper level.

Open the permit page

$125,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Fontana Construction, Inc. (5)
Architects
Nancy Scheinholtz (4)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.