Back to kitchen remodel contractors
Fnj Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2009 to Aug 2015
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 269 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2014 | Completed final sign-off Jul 2015 | 601 Van Ness Av | layout to stay the same, no structural work to be performed. remove & replace existing cabinets in kitchen. install new cabinets, sink, faucet, appliances, remove existing restroom fixtures, light fan, tub, toilet, sink vanity. install new layout to stay the same.Details
layout to stay the same, no structural work to be performed. remove & replace existing cabinets in kitchen. install new cabinets, sink, faucet, appliances, remove existing restroom fixtures, light fan, tub, toilet, sink vanity. install new layout to stay the same. | $18,000 |